The FY2027 President's Budget requests $156.3M for Mississippi River and Tributaries, within Army Corps of Engineers's Mississippi River and Tributaries account.
FY2027–FY2027
| Fiscal year | Basis | Amount |
|---|---|---|
| FY2027 | request | $156.3M |
Bases are separate columns and are never summed into one figure.
Army Corps of Engineers discretionary budget authority
From the OMB Public Budget Database — clean, summable, and the figure to cite for an agency total. It is the whole of Army Corps of Engineers's discretionary request, not a total of the parsed lines above, and this page never adds the two together.
What this funds
Funds flood control and related work in the lower Mississippi River alluvial valley and its tributaries, emphasizing the levees and features on the main stem of the lower Mississippi River and the Atchafalaya Basin.
Extracted from USACE Civil Works, p. 4. Verbatim; nothing here is paraphrased.
Contracts funded by this line
13 linked contracts. These are obligations — lifetime awarded money — and they are not comparable to the request above and are never added to it. No total is shown: an award linked to several lines is counted in full on each, so the sum would not be a fact.
| Contract | Vendor | Confidence | Obligated |
|---|---|---|---|
| W912P822C0055 last action FY2024 | FORDICE CONSTRUCTION CO | Medium confidence | $45.8M |
| W912P823C0048 last action FY2026 | MCMILLEN, INC. | Medium confidence | $37.3M |
| W912QR25FA050 last action FY2025 | LUHR CROSBY, LLC | Medium confidence | $11.0M |
| 0002 last action FY2020 | PINE BLUFF SAND AND GRAVEL COMPANY | Medium confidence | $7.0M |
| W912P825F0112 last action FY2025 | MSMM HUITT-ZOLLARS A JOINT VENTURE LLC | Medium confidence | $5.5M |
| W912EE20C0005 last action FY2026 | RIVERSIDE CONSTRUCTION CO INC | Medium confidence | $4.3M |
| 0001 last action FY2020 | LUHR BROS., INC. | Medium confidence | $4.2M |
| W912P819C0077 last action FY2023 | APC CONSTRUCTION LLC | Medium confidence | $3.3M |
Showing 8 of 13 — most confidently matched first, largest within a confidence tier. These are not necessarily the largest 8.
Confidence mix · 13 medium
Linked contracts are a floor, not a census. Coverage is bounded by how distinctively a program is named and, for performer links, to RDT&E and Procurement — O&M and military construction publish no performers. Budget figures are FY2027 request dollars; contract figures are obligations. The two measure different things and must never be summed together.
Ask this budget line
Answers come from the figures on this page and nothing else. These dollars are parsed from Army Corps of Engineers's Congressional Justification and are approximate — confirm anything that matters against the cited page.
This page carries the budget justification only. Contract obligations live at hitchintel.com/vendors; open solicitations at hitchintel.com/opportunities.