HitchAI
Energy · President's Budget PB2027

Unallocated Funds - Naval Reactors

Energy·Defense (050)·CJ p. 17
FY2027 Request
Parsed · CJ — verify
Parsed · verify

This figure was parsed from Energy's FY2027 Congressional Justification, not from a standard budget exhibit. It is approximate and it is not summable with other lines. It is published so you can check it: the citation below names the exact page it was read off. Where a dollar figure matters, verify it there before using it.

The FY2027 President's Budget requests for Unallocated Funds - Naval Reactors, within Energy's Defense (050) account.

Authoritative context

Energy discretionary budget authority

FY2027 request$36.30B
FY2026$58.20B
Change▼ 38%

From the OMB Public Budget Database — clean, summable, and the figure to cite for an agency total. It is the whole of Energy's discretionary request, not a total of the parsed lines above, and this page never adds the two together.

In the agency's own words

What this funds

14-D-901 Spent Fuel Handling Recapitalization Project NRF FY 2027 Congressional Justification 6. Related Operations and Maintenance Funding Requirements Start of Operation of Beneficial Occupancy 1QFY2031 Expected Future Start of D&D 1QFY2071 Annual Costs (FY31 $K) Life Cycle Costs (then-year The Operations and Maintenance costs include the recurring costs to operate the Naval Spent Fuel Handling maintain and refurbish facility systems. The Transition to Operations and Future Installation costs include one- time costs to expand the capabilities of the facility and to transition the facility to a fully operational status including checkout, training, and qualification of work teams. The new area being constructed in this project is replacing existing facilities. However, spent fuel handling operations in the existing Expended Core Facility will overlap with operations in the new Naval Spent Fuel Handling Facility for a period of 5 to 12 years, and examination operations in the existing Expended Core Facility will continue for the foreseeable future; therefore, the costs associated with D&D of the Expended Core Facility are not included in the costs cited for the SFHP. New area being constructed by this Project at the Naval Area of D&D in this Project at the Naval Reactors Facility 0 Area at the Naval Reactors Facility to be transferred, sold, and/or D&D outside the project inclu

Extracted from doe fy 2027 volume 1 nr, p. 38. Verbatim; nothing here is paraphrased. This is a different document from the one the figures above were read off — the agency prints this line's dollars in a summary table and its justification elsewhere.

Ask Hitch

Ask this budget line

Answers come from the figures on this page and nothing else. These dollars are parsed from Energy's Congressional Justification and are approximate — confirm anything that matters against the cited page.

H
Questions this page can answer
What does Unallocated Funds - Naval Reactors fund?How has the funding changed year over year?How does this sit inside Energy's discretionary budget?Where can I verify this figure?

This page carries the budget justification only. Contract obligations live at hitchintel.com/vendors; open solicitations at hitchintel.com/opportunities.