HitchAI
Homeland Security · President's Budget PB2027

Critical Repair/Replacement Requirement

Homeland Security·Procurement, Construction, and Improvements·CJ p. 4
FY2027 Request
$10.0M
Parsed · CJ — verify
FY2026 CR annualized $24.0M
Parsed · verify

This figure was parsed from Homeland Security's FY2027 Congressional Justification, not from a standard budget exhibit. It is approximate and it is not summable with other lines. It is published so you can check it: the citation below names the exact page it was read off. Where a dollar figure matters, verify it there before using it.

The FY2027 President's Budget requests $10.0M for Critical Repair/Replacement Requirement, within Homeland Security's Procurement, Construction, and Improvements account. That is down 58% on the FY2026 figure of $24.0M, which is a continuing-resolution annualized figure, not an enacted appropriation.

Funding

FY2025–FY2027

Fiscal yearBasisAmount
FY2025enacted$24.0M
FY2026CR annualized$24.0M
FY2027request$10.0M

The prior-year column is a CR annualized figure — the rate a continuing resolution funds at, not an enacted appropriation. The two are different numbers and are not interchangeable. Bases are separate columns and are never summed into one figure.

Authoritative context

Homeland Security discretionary budget authority

FY2027 request$91.40B
FY2026$88.60B
Change▲ 3.2%

From the OMB Public Budget Database — clean, summable, and the figure to cite for an agency total. It is the whole of Homeland Security's discretionary request, not a total of the parsed lines above, and this page never adds the two together.

In the agency's own words

What this funds

This investment focuses on critical infrastructure upgrades and replacements for S&T's laboratory facilities operated by the Office of National regulatory requirements such as biological select agent regulations, operate according to modern technology standards, and perform end-of-life replacements for mission-critical equipment. FY 2027 planned projects focus on NBACC and TSL, two S&T ONL-owned and operated laboratories. The FY 2027 Budget includes $10.0M to support planned improvements and address facility deficiencies to include: ' $2.0M - Replacement of NBACC Bio Safety Level 3 (BSL3) lab airlock doors. ' $0.6M - Replacement of two NBACC autoclave control systems. Construction and Facility Improvements - PPA Critical Repair/Replacement Requirement Replacement of end-of-life laboratory equipment at NBACC FY 2027 Q2 Procurement of end-of-life laboratory equipment at TSL FY 2027 Q3 Replacement of NBACC Bio Safety Level 3 (BSL3) lab airlock doors FY 2027 Q4 Procurement of quality control support instrumentation at TSL FY 2027 Q4 Replacement of NBACC Autoclave Control Systems Construction and Facility Improvements - PPA Plum Island Closure and Support

Extracted from Science and Technology Directorate, p. 4. Verbatim; nothing here is paraphrased.

What was actually awarded

Contracts funded by this line

83 linked contracts. These are obligations — lifetime awarded money — and they are not comparable to the request above and are never added to it. No total is shown: an award linked to several lines is counted in full on each, so the sum would not be a fact.

ContractVendorConfidenceObligated
W31P4Q12C0029
last action FY2026
SERCO INCMedium confidence$180.9M
HC104719F0002
last action FY2025
PERATON INC.Medium confidence$151.9M
86615423C00001
last action FY2025
PERATON ENTERPRISE SOLUTIONS LLCMedium confidence$150.9M
HHSN276201300006C
last action FY2024
ICF Z-TECH, INC.Medium confidence$51.7M
70SBUR22F00000252
last action FY2026
AT&T ENTERPRISES, LLCMedium confidence$46.7M
SAQMMA17F3268
last action FY2022
PAE GOVERNMENT SERVICES, INC.Medium confidence$46.5M
70SBUR26F00000001
last action FY2026
GOVPLACE, LLCMedium confidence$44.3M
0006
last action FY2021
INNOVASYSTEMS INTERNATIONAL LLCMedium confidence$38.4M

Showing 8 of 83 — most confidently matched first, largest within a confidence tier. These are not necessarily the largest 8.

Confidence mix · 83 medium

Linked contracts are a floor, not a census. Coverage is bounded by how distinctively a program is named and, for performer links, to RDT&E and Procurement — O&M and military construction publish no performers. Budget figures are FY2027 request dollars; contract figures are obligations. The two measure different things and must never be summed together.

Ask Hitch

Ask this budget line

Answers come from the figures on this page and nothing else. These dollars are parsed from Homeland Security's Congressional Justification and are approximate — confirm anything that matters against the cited page.

H
Questions this page can answer
What does Critical Repair/Replacement Requirement fund?How has the funding changed year over year?How does this sit inside Homeland Security's discretionary budget?Where can I verify this figure?

This page carries the budget justification only. Contract obligations live at hitchintel.com/vendors; open solicitations at hitchintel.com/opportunities.