In-Service Vessel Sustainment

Homeland Security·Procurement, Construction, and Improvements·CJ p. 6
FY2027 Request
$121.2M
Parsed · CJ — verify
FY2026 CR annualized $153.0M
Parsed · verify

This figure was parsed from Homeland Security's FY2027 Congressional Justification, not from a standard budget exhibit. It is approximate and it is not summable with other lines. It is published so you can check it: the citation below names the exact page it was read off. Where a dollar figure matters, verify it there before using it.

The FY2027 President's Budget requests $121.2M for In-Service Vessel Sustainment, within Homeland Security's Procurement, Construction, and Improvements account. That is down 21% on the FY2026 figure of $153.0M, which is a continuing-resolution annualized figure, not an enacted appropriation.

Funding

FY2025–FY2027

Fiscal yearBasisAmount
FY2025enacted$153.0M
FY2026CR annualized$153.0M
FY2027request$121.2M

The prior-year column is a CR annualized figure — the rate a continuing resolution funds at, not an enacted appropriation. The two are different numbers and are not interchangeable. Bases are separate columns and are never summed into one figure.

Authoritative context

Homeland Security discretionary budget authority

FY2027 request$91.40B
FY2026$88.60B
Change▲ 3.2%

From the OMB Public Budget Database — clean, summable, and the figure to cite for an agency total. It is the whole of Homeland Security's discretionary request, not a total of the parsed lines above, and this page never adds the two together.

In the agency's own words

What this funds

Funds program management and logistics support for vessel repair availabilities, including MMAs and SLEPs on existing USCG vessels. This investment includes vessel availabilities supported by the USCG Yard. Funds program management activities and production efforts on the CGC Healy SLEP, 175-foot Coastal Buoy Tender MMA, and 418-foot NSC MMA. MMAs ensure in-service vessels continue to meet their designed service life through the recapitalization of Hull, Mechanical, Electrical (HM&E) and electronic systems that have been identified as the highest contributors to maintenance costs and operational availability degradation. ' Completed production work on the sixteenth 225-foot WLB. This will complete 225-foot WLB MMA. ' Completed production on second 270-foot WMEC SLEP hull and began production on third hull. ' Continued detail design engineering and procurement for long lead time materials for CGC Healy SLEP. ' Continued detail design engineering and procurement for long lead time materials for 175-foot WLM MMA. Began production on first hull. ' Began detail design engineering and procurement for long lead time materials for 418-foot WMSL MMA. ' Complete production on the third 270-foot WMEC SLEP hull and begin production on the fourth and fifth hulls. ' Continue detail design engineering and procurement for long lead time materials for CGC Healy SLEP. ' Continue detail design engineering and procurement for long lead time materials for 175-foot WLM MMA. Continue production on first 175-foot ' Continue detail design engineering and procurement for long lead time materials for 418-foot WMSL MMA.

Extracted from United States Coast Guard, p. 6. Verbatim; nothing here is paraphrased.

What was actually awarded

Contracts funded by this line

2 linked contracts. These are obligations — lifetime awarded money — and they are not comparable to the request above and are never added to it. No total is shown: an award linked to several lines is counted in full on each, so the sum would not be a fact.

ContractVendorConfidenceObligated
70Z02319FAFR92700
last action FY2024
MANAGEMENT & TECHNICAL SERVICES ALLIANCE JOINT VENTUREMedium confidence$33.8M
L609
last action FY2017
ICI SERVICES CORPORATIONMedium confidence$2.0M

Confidence mix · 2 medium

Linked contracts are a floor, not a census. Coverage is bounded by how distinctively a program is named and, for performer links, to RDT&E and Procurement — O&M and military construction publish no performers. Budget figures are FY2027 request dollars; contract figures are obligations. The two measure different things and must never be summed together.

Ask Hitch

Ask this budget line

Answers come from the figures on this page and nothing else. These dollars are parsed from Homeland Security's Congressional Justification and are approximate — confirm anything that matters against the cited page.

H
Questions this page can answer
What does In-Service Vessel Sustainment fund?How has the funding changed year over year?How does this sit inside Homeland Security's discretionary budget?Where can I verify this figure?

This page carries the budget justification only. Contract obligations live at hitchintel.com/vendors; open solicitations at hitchintel.com/opportunities.