# In-Service Vessel Sustainment

**Agency:** Homeland Security  
**Account:** Procurement, Construction, and Improvements  
**Source document:** United States Coast Guard · p. 6  
**Vintage:** President's Budget PB2027  
**Canonical URL:** https://hitchintel.com/budget/homeland-security/in-service-vessel-sustainment  

> **Trust:** parsed from the agency Congressional Justification. Approximate, **not summable**, verify at the cited page.

## Funding ($M)

| Fiscal year | Basis | Amount |
| --- | --- | --- |
| FY2025 | enacted | 153.0 |
| FY2026 | CR annualized | 153.0 |
| FY2027 | request | 121.2 |

The prior-year column is a CR annualized figure, not an enacted appropriation.


## Homeland Security discretionary budget authority (OMB PBDB — authoritative)

FY2027 $91.40B, FY2026 $88.60B. This is the agency total, not a sum of the parsed lines.


## What this funds

Funds program management and logistics support for vessel repair availabilities, including MMAs and SLEPs on existing USCG vessels. This investment includes vessel availabilities supported by the USCG Yard. Funds program management activities and production efforts on the CGC Healy SLEP, 175-foot Coastal Buoy Tender MMA, and 418-foot NSC MMA. MMAs ensure in-service vessels continue to meet their designed service life through the recapitalization of Hull, Mechanical, Electrical (HM&E) and electronic systems that have been identified as the highest contributors to maintenance costs and operational availability degradation. ' Completed production work on the sixteenth 225-foot WLB. This will complete 225-foot WLB MMA. ' Completed production on second 270-foot WMEC SLEP hull and began production on third hull. ' Continued detail design engineering and procurement for long lead time materials for CGC Healy SLEP. ' Continued detail design engineering and procurement for long lead time materials for 175-foot WLM MMA. Began production on first hull. ' Began detail design engineering and procurement for long lead time materials for 418-foot WMSL MMA. ' Complete production on the third 270-foot WMEC SLEP hull and begin production on the fourth and fifth hulls. ' Continue detail design engineering and procurement for long lead time materials for CGC Healy SLEP. ' Continue detail design engineering and procurement for long lead time materials for 175-foot WLM MMA. Continue production on first 175-foot ' Continue detail design engineering and procurement for long lead time materials for 418-foot WMSL MMA.


**Where it sits:** Civilian / Non-Defense › Homeland Security › United States Coast Guard › Procurement, Construction, and Improvements › Vessels


*HitchAI is an independent intelligence service, not affiliated with the U.S. government. Civilian line dollars are parsed from agency Congressional Justifications and are approximate.*