HitchAI
Interior · President's Budget PB2027

Central Valley Project Restoration Fund

Interior·Central Valley Project Restoration Fund·CJ p. 16
FY2027 Request
$67.0M
Parsed · CJ — verify
FY2026 enacted $65.4M
Parsed · verify

This figure was parsed from Interior's FY2027 Congressional Justification, not from a standard budget exhibit. It is approximate and it is not summable with other lines. It is published so you can check it: the citation below names the exact page it was read off. Where a dollar figure matters, verify it there before using it.

The FY2027 President's Budget requests $67.0M for Central Valley Project Restoration Fund, within Interior's Central Valley Project Restoration Fund account. That is up 2.4% on the FY2026 figure of $65.4M, which is the enacted appropriation.

Funding

FY2026–FY2027

Fiscal yearBasisAmount
FY2026enacted$65.4M
FY2027request$67.0M

Bases are separate columns and are never summed into one figure.

Authoritative context

Interior discretionary budget authority

FY2027 request$18.80B
FY2026$17.30B
Change▲ 8.7%

From the OMB Public Budget Database — clean, summable, and the figure to cite for an agency total. It is the whole of Interior's discretionary request, not a total of the parsed lines above, and this page never adds the two together.

In the agency's own words

What this funds

Funds fish, wildlife, and habitat restoration and mitigation in California's Central Valley Project, financed by project water and power user payments.

Extracted from Bureau of Reclamation, p. 16. Verbatim; nothing here is paraphrased.

What was actually awarded

Contracts funded by this line

20 linked contracts. These are obligations — lifetime awarded money — and they are not comparable to the request above and are never added to it. No total is shown: an award linked to several lines is counted in full on each, so the sum would not be a fact.

ContractVendorConfidenceObligated
15M40023FA3500005
last action FY2026
THE GEO GROUP, INC.Medium confidence$66.2M
15M40022FA3500023
last action FY2025
THE GEO GROUP, INC.Medium confidence$42.8M
15M40021FA3500015
last action FY2022
THE GEO GROUP, INC.Medium confidence$23.3M
140R2022F0056
last action FY2026
ICF INCORPORATED, L.L.C.Medium confidence$15.5M
140R8118F0322
last action FY2024
ICF INCORPORATED, L.L.C.Medium confidence$9.1M
140R2020P0085
last action FY2024
WATERCOURSE ENGINEERING, INC.Medium confidence$7.4M
140R2025F0047
last action FY2025
STANTEC CONSULTING SERVICES INC.Medium confidence$5.1M
W9126G10C0009
last action FY2024
PENNA GROUP, L L C, THEMedium confidence$2.9M

Showing 8 of 20 — most confidently matched first, largest within a confidence tier. These are not necessarily the largest 8.

Confidence mix · 20 medium

Linked contracts are a floor, not a census. Coverage is bounded by how distinctively a program is named and, for performer links, to RDT&E and Procurement — O&M and military construction publish no performers. Budget figures are FY2027 request dollars; contract figures are obligations. The two measure different things and must never be summed together.

Ask Hitch

Ask this budget line

Answers come from the figures on this page and nothing else. These dollars are parsed from Interior's Congressional Justification and are approximate — confirm anything that matters against the cited page.

H
Questions this page can answer
What does Central Valley Project Restoration Fund fund?How has the funding changed year over year?How does this sit inside Interior's discretionary budget?Where can I verify this figure?

This page carries the budget justification only. Contract obligations live at hitchintel.com/vendors; open solicitations at hitchintel.com/opportunities.