FY2027 Request
Parsed · CJ — verify
FY2026 enacted $3.9M
Parsed · verify

This figure was parsed from Interior's FY2027 Congressional Justification, not from a standard budget exhibit. It is approximate and it is not summable with other lines. It is published so you can check it: the citation below names the exact page it was read off. Where a dollar figure matters, verify it there before using it.

The FY2027 President's Budget requests for Employee Housing Repair, within Interior's Education Construction account.

Funding

FY2026–FY2026

Fiscal yearBasisAmount
FY2026enacted$3.9M

Bases are separate columns and are never summed into one figure.

Authoritative context

Interior discretionary budget authority

FY2027 request$18.80B
FY2026$17.30B
Change▲ 8.7%

From the OMB Public Budget Database — clean, summable, and the figure to cite for an agency total. It is the whole of Interior's discretionary request, not a total of the parsed lines above, and this page never adds the two together.

In the agency's own words

What this funds

address efforts to further assess and address deferred maintenance across BIE schools, with a targeted focus on improving building safety, and structural integrity. These investments are critical to providing safe, sustainable learning environments for students and staff, reducing long- term maintenance liabilities, and enabling schools to remain fully operational. Prioritizing life- safety deficiencies and high-risk systems ensures that limited resources are deployed effectively to mitigate hazards and support uninterrupted educational services. Tribal Colleges Facilities Improvement and Repair (-$16,000,000/ 0 FTE) - The budget does not request funding for Replacement School Construction. The FY 2025 Deferred Maintenance and Repair (DM&R) for Education Construction was estimated at approximately $1 billion. This estimate includes schools, housing, operational buildings, recreation, utility assets and DM&R associated with grounds which started being reported in the Federal Real Property Profile (FRPP) in FY 2024. BIE is prioritizing school projects to ensure that students are able to attend safe, healthy, and culturally relevant schools, but deferred maintenance and repairs continue to accrue. A Lifecyle Pilot Program is being initiated for BIE schools to replace roofs, boilers, and HVAC systems before they fail and have reached the end of their useful life. Year Within Name District Project to Request to be Years of Category/ Improvement and Repair million at various locations 3,000

Extracted from Bureau of Indian Education, p. 45. Verbatim; nothing here is paraphrased.

Ask Hitch

Ask this budget line

Answers come from the figures on this page and nothing else. These dollars are parsed from Interior's Congressional Justification and are approximate — confirm anything that matters against the cited page.

H
Questions this page can answer
What does Employee Housing Repair fund?How has the funding changed year over year?How does this sit inside Interior's discretionary budget?Where can I verify this figure?

This page carries the budget justification only. Contract obligations live at hitchintel.com/vendors; open solicitations at hitchintel.com/opportunities.