NASA · President's Budget PB2027

Construction and Environmental Compliance and Restoration

NASA·Construction and Environmental Compliance and Restoration·CJ p. 2
FY2027 Request
$100.6M
Parsed · CJ — verify
FY2026 enacted $185.3M
Parsed · verify

This figure was parsed from NASA's FY2027 Congressional Justification, not from a standard budget exhibit. It is approximate and it is not summable with other lines. It is published so you can check it: the citation below names the exact page it was read off. Where a dollar figure matters, verify it there before using it.

The FY2027 President's Budget requests $100.6M for Construction and Environmental Compliance and Restoration, within NASA's Construction and Environmental Compliance and Restoration account. That is down 46% on the FY2026 figure of $185.3M, which is the enacted appropriation.

Funding

FY2025–FY2027

Fiscal yearBasisAmount
FY2025enacted$300.0M
FY2026enacted$185.3M
FY2027request$100.6M

Bases are separate columns and are never summed into one figure.

Authoritative context

NASA discretionary budget authority

FY2027 request$18.80B
FY2026$24.40B
Change▼ 23%

From the OMB Public Budget Database — clean, summable, and the figure to cite for an agency total. It is the whole of NASA's discretionary request, not a total of the parsed lines above, and this page never adds the two together.

In the agency's own words

What this funds

Funds NASA's asset portfolio through two themes: design, construction, and demolition of aging infrastructure, utility systems, and facilities under Construction of Facilities, and environmental cleanup and restoration under Environmental Compliance and Restoration.

Extracted from NASA, p. 2. Verbatim; nothing here is paraphrased.

What was actually awarded

Contracts funded by this line

549 linked contracts. These are obligations — lifetime awarded money — and they are not comparable to the request above and are never added to it. No total is shown: an award linked to several lines is counted in full on each, so the sum would not be a fact.

ContractVendorConfidenceObligated
80MSFC18C0011
last action FY2026
AMENTUM TECHNOLOGY, INC.Certain$1,976.5M
NNK13MA14C
last action FY2024
AMENTUM TECHNOLOGY, INC.Certain$1,969.9M
80GSFC19C0063
last action FY2026
PERATON INC.Certain$1,503.4M
NNS15AA77T
last action FY2026
SYNCOM SPACE SERVICES LLCCertain$817.4M
80KSC018C0017
last action FY2026
AMENTUM SPACEPORT LLCCertain$634.7M
NNJ08JA02C
last action FY2025
PAE APPLIED TECHNOLOGIES LLCCertain$414.5M
80GSFC17C0010
last action FY2026
TRAX INTERNATIONAL CORPORATIONCertain$405.6M
NNS15AA75T
last action FY2026
SYNCOM SPACE SERVICES LLCCertain$391.7M

Showing 8 of 549 — most confidently matched first, largest within a confidence tier. These are not necessarily the largest 8.

Confidence mix · 549 certain

Linked contracts are a floor, not a census. Coverage is bounded by how distinctively a program is named and, for performer links, to RDT&E and Procurement — O&M and military construction publish no performers. Budget figures are FY2027 request dollars; contract figures are obligations. The two measure different things and must never be summed together.

Ask Hitch

Ask this budget line

Answers come from the figures on this page and nothing else. These dollars are parsed from NASA's Congressional Justification and are approximate — confirm anything that matters against the cited page.

H
Questions this page can answer
What does Construction and Environmental Compliance and Restoration fund?How has the funding changed year over year?How does this sit inside NASA's discretionary budget?Where can I verify this figure?

This page carries the budget justification only. Contract obligations live at hitchintel.com/vendors; open solicitations at hitchintel.com/opportunities.