# Strategic Weapon Integration

**R-2A activity** of project 3097 — W-93 / Mk 7  
**Program element:** 0101221N — Strategic Sub & Wpns Sys Supt  
**Component:** U.S. Navy · **Budget Activity:** 7  
**Vintage:** President's Budget PB2027  
**Canonical URL:** https://hitchintel.com/programs/0101221N/3097/a4  
**Parent:** https://hitchintel.com/programs/0101221N/3097

## Summary

This activity requests $48.6M in FY2027, 5.8% of project 3097, up 34% on FY2026. The R-2A exhibit describes it across FY2026–FY2027, including what the FY2027 money is planned to buy.

## What the FY2027 request buys

**FY2027 planned work.** - Execute systems engineering and integration at SWS-level including requirements management, architecture integration, verification and validation, and coordinated interface analyses for W93/Mk7. - Support major system-level milestone reviews. - Conduct Weapon System Impact reviews and analyses including Strategic Weapons System Program Alterations (SPALTs), Ship Alterations (SHIPALTs), Temporary Alterations (TEMPALTs), and Technical Requirements and Interface Documents (TRIDs) for Coordination, Cabling, and Data Requirements impacts. - Maintain coordination engineering while providing Data Requirements engineering and documentation. - Support Mk7 accuracy performance analysis including accuracy trade studies, flight analysis, development of Mk7 data-derived models, and U.S. Planning Factors development. - Develop and modify Initial Processing (IP) and Performance Evaluation (PE) Software to support Mk7 deployment and convert flight instrumentation data to common analysis format. - Create modernized data architecture to accelerate Mk7 accuracy analysis. - Conduct employment engineering analyses including use case development, requirements analysis, mission effectiveness assessments for warfighter utility, and threat mitigation evaluations.

**FY2026 to FY2027 change.** The requested $12.29 million funding increase is required to transition the Mk7 program from milestone design reviews to full SWS-level integration. This FY 2027 funding will support comprehensive weapon system impact analyses, multi-platform coordination engineering, and the development of a modernized data architecture to accelerate accuracy analysis. Key activities include completing pre- and post-flight analysis for FCET-9 while initiating planning for FCET-10. The funding also enables critical employment engineering studies and prepares data retention systems for future USSTRATCOM reliability reporting.

## Before the request year

**FY2026 plans — current year.** - Execute a comprehensive SWS Preliminary Design Review (PDR) in FY 2026 to rigorously assess the design's maturity and readiness for detailed design. - Conduct ongoing system-level trade studies to evaluate alternative design options and assess their impact on overall system performance, cost, and schedule. - Initiate software development activities to create the necessary tools and simulations for conducting comprehensive system-level evaluations. - Develop software modules to model the behavior of various system components and simulate their interactions under different operating conditions. - Implement robust data acquisition and analysis capabilities to collect and process data from system-level evaluations, providing valuable insights into system performance. - Achieve Milestone B.

## Funding

| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 7.1 |
| FY2026 | Enacted | 36.3 |
| FY2027 | Request | 48.6 |

> Prior, current and budget year only — an R-2A activity carries no five-year plan. It sums exactly into its project in the request year and not necessarily in any other.

## Other activities in project 3097

- [RBA Development](https://hitchintel.com/programs/0101221N/3097/a0) — FY2027 434.2
- [Arming and Fuzing Development](https://hitchintel.com/programs/0101221N/3097/a1) — FY2027 279.7
- [RBA to Missile Integration Development](https://hitchintel.com/programs/0101221N/3097/a3) — FY2027 58.3
- [Fire Control Development](https://hitchintel.com/programs/0101221N/3097/a2) — FY2027 20.4

## Source & machine access

- **Source:** FY2027 Department of the Navy RDT&E Budget Justification, Exhibit R-2A, PE 0101221N project 3097 (PB PB2027). Narrative is the government's own text.
- **No marks, no contractors at this grain** — congressional marks land on the program element and R-3 performers on the project.