# Project 3093 — TACTS/LATR Replacement

**Program element:** 0204571N — Consolidated Trng Sys Dev  
**Project:** 3093  
**Component:** U.S. Navy  
**Appropriation:** 1319 — RDT&E, Navy  
**Budget Activity:** 7 — Operational System Development  
**Vintage:** President's Budget PB2027  
**Canonical URL:** https://hitchintel.com/programs/0204571N/3093  
**Parent:** https://hitchintel.com/programs/0204571N

## Summary

Project 3093 — TACTS/LATR Replacement requests $48.5M in FY2027, 42% of the $115.8M requested for program element 0204571N, down 46% on FY2026. 5 R-2A activities decompose the request, 2 new this cycle. NAWCAD is the largest named R-3 performer at $18.1M, 37% of the project's FY2027 R-3 total.

## Funding profile

| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 64.0 |
| FY2026 | Enacted | 90.3 |
| FY2027 | Request | 48.5 |
| FY2028 | Outyear | 62.6 |
| FY2029 | Outyear | 57.8 |
| FY2030 | Outyear | 49.8 |
| FY2031 | Outyear | 50.6 |

> Estimate types are not summed. This project is one leaf of PE 0204571N; the PE total is the sum of its projects, never added to them.

## What project 3093 buys

The Tactical Combat Training System Increment II (TCTS II) will provide an improved environment for air combat training utilizing a secure air-to-air and air-to-ground data link, and will provide range tethered and range less operation capability to CONUS ranges and Forward Deployed Naval Forces (FDNF). TCTS Increment II will provide encrypted instrumentation for multiple fixed and rotary wing platforms as well as an enhanced threat environment. In 2023, TCTS II started development of Synthetic Inject to Live (SITL) capability, which enables blue and red constructive (e.g. aircraft, air and surface threats) injects into aircraft displays and sensors to train aircrews for near-peer threats. The program is integrating into the Navy Continuous Training Environment (NCTE), allowing mission data from "Live" participants to be monitored at a control facility and disseminated across the LVC ecosystem. TCTS Increment II provides the foundational encrypted airborne network for implementation of Aviation Live Virtual Constructive (LVC) capabilities. TCTS II will continue software updates to address fleet requirements. Aviation LVC Live Aircraft Integration (ALLAI) Phase 1 funds the integration of live aircraft into the LVC, blended training environment to close the Great Powers Competition training capability gap for mission rehearsal. Aviation LVC will establish an integrated System of Systems (SoS) training environment bringing already-developed capabilities together with new developmental efforts to form a cohesive architecture that accurately emulates the high end fight for warfighter training. LVC takes a hybrid approach to aviation and Fleet-wide training where the training audience in the form of Live personnel operating Live equipment (to include aircraft and surface vessels) will be teamed with Live aircrew operating simulators to provide a Virtual complement in the "Blue Air" picture. The "Red" adversary for this training is made up of Live personnel operating Live aircraft complemented by computer generated "Red" Constructive Air and Surface threats that stimulate the "Blue" Air displays and sensors as if a "Red" Live adversary were present.

**R-3 lines of work:** Product Development; Support; Test and Evaluation; Management Services.

## Named R-3 performers

| Performer | $M | Share of this project's FY2027 R-3 total |
|---|---|---|
| NAWCAD | 18.1 | 37% |
| JT4 | 13.2 | 27% |
| Lockheed Martin | 4.0 | 8.2% |
| NAWCWD | 3.8 | 7.9% |

> Budget-justification contract funding, not obligations. Shares need not reach 100% — unnamed and government work is in the denominator.

## Activities (R-2A) — 5

| Activity | FY2025 | FY2026 | FY2027 | Move | Page |
|---|---|---|---|---|---|
| Tactical Combat Training Systems (TCTS) Increment II | 18.4 | 37.9 | 21.1 | −44% | [a1](https://hitchintel.com/programs/0204571N/3093/a1) |
| Aviation LVC Live Aircraft Integration - Phase I | 32.1 | 38.4 | 11.0 | −71% | [a0](https://hitchintel.com/programs/0204571N/3093/a0) |
| Aviation Performance / Proficiency Analytics (APPA) | 13.4 | 14.0 | 11.0 | −21% | [a3](https://hitchintel.com/programs/0204571N/3093/a3) |
| LITL | 0.0 | 0.0 | 4.0 | new | — |
| Internal Mount | 0.0 | 0.0 | 1.4 | new | — |

> Activities carry the prior, current and budget year only — no five-year plan. In the request year they partition this project exactly; in earlier years they can under-cover it.

### Tactical Combat Training Systems (TCTS) Increment II

TCTS II will continue to develop, test and deliver software to include NGTS and Open Air Battle Shaping (OABS) incorporation with a path to complete threat replication, and NCTE compatibility. With the number of TCTS II systems being fielded, waveform modifications will occur for spectral efficiency and increasing event size and…

Full year-by-year narrative: https://hitchintel.com/programs/0204571N/3093/a1

### Aviation LVC Live Aircraft Integration - Phase I

Funds are allocated to the ALLAI program to continue the integration and developmental testing of Live, Virtual, and Constructive (LVC) software capabilities on the F/A-18, including updated Next Generation Threat System (NGTS) simulations and waveform optimization. Resources will support required Cross Domain Solution (CDS) design…

Full year-by-year narrative: https://hitchintel.com/programs/0204571N/3093/a0

### Aviation Performance / Proficiency Analytics (APPA)

Develop and integrate government-owned standards and architecture for aviation performance data collection, supported by tactical subject matter experts (SMEs) and data scientists. The system includes multilevel security databases, network capabilities, and intelligent, semi-automated assessments, reporting, and visualization tools, all…

Full year-by-year narrative: https://hitchintel.com/programs/0204571N/3093/a3

### LITL — NEW START

**FY2027 planned work.** This is a continuation of development and integration of Link Inject to Live (LITL). LITL will integrate Live, Virtual, Constructive (LVC) exercises for training purposes. LITL utilizes a synthetic scenario generation tool and integrates live game players into the synthetic environment by a message set communicated over Link-16. Synthetic entity information delivered over Link-16 will be injected into the existing platform training capability which will be modified to accommodate the LITL synthetic environment.

**FY2026 to FY2027 change.** Link Inject to Live funding increased from FY26 to FY27 in the amount of $4.0M due to the realignment from the Tactical Combat Training Systems, Increment II (TCTS II) as the program has matured and been put on contract with the Joint Program Office.

### Internal Mount — NEW START

**FY2027 planned work.** E-2D Internal Mount will continue development and integration of a chassis mounted solution to provide encrypted Time, Space, Position Information (TSPI) in support of Tactical Training Range operations. Development will include pursuing National Security Agency (NSA) certification to an upgrade to the current TCTS II encryptor to be in compliance with Security Evaluation Requirements Document (SERD) 2.0 requirements. E-2D Internal Mount will be an enabler to Synthetic Inject to Live (SITL) for the platform and is required for future untethered (removed from Tactical Training Ranges) operations.

**FY2026 to FY2027 change.** The increase from FY26 to FY27 in the amount of $1.4M is due to E-2D Internal Mount (IM) funds being realigned from Tactical Combat Training Systems, Increment II (TCTS II) as the IM program has matured and moved from requirements definition to development.

## What is NOT on this page

Congressional marks, the R-2 mission description and acquisition strategy, the industry vs government split of the whole request, and related program elements are recorded at **program-element** grain — an NDAA mark lands on a PE, never on a project. They are at https://hitchintel.com/programs/0204571N.

## Source & machine access

- **Source:** FY2027 Department of the Navy RDT&E Budget Justification, Exhibits R-2/R-2A/R-3, PE 0204571N project 3093 (PB PB2027).
- **MCP:** `mcp.hitchintel.com` — `budget_get_program_element(pe="0204571N")`.

*HitchAI is an independent intelligence service, not affiliated with the U.S. Department of Defense. Budget figures are requests/estimates, not obligations.*