RDT&E Project · President's Budget PB2027

Guided MLRS

FY2027 Request
$54.1M
▲ 2038% vs FY2026
HitchAI read

Project EG3 — Guided MLRS requests $54.1M in FY2027, 73% of the $73.6M requested for program element 0205778A, up 2038% on FY2026. 3 R-2A activities decompose the request.

MarketLong-Range & Precision Fires

Matched on this project's title. A title match, not a curated taxonomy — narrative-only matches are not shown at all rather than shown with a caveat nobody reads. No market size is quoted here: a market spans appropriations far beyond this program element.

FY2027 Request
$54.1M
▲ 2038% vs FY2026
FY2026 Enacted
$2.5M
▼ 87% vs FY2025
FY2025 Actual
$19.8M
Prior year
Project detail

What project EG3 buys

The U.S. Army continues to explore ways to enhance Guided Multiple Launch Rocket System (GMLRS) rockets and common components under Project EG3: Guided MLRS. The Army is requesting funding for GMLRS Research, Development, Test and Evaluation (RDT&E) development, integration, and test activities to enhance operational capabilities including increased range, improved lethality and survivability, enhanced flight performance, and Assured Positioning, Navigation and Timing (APNT). FY 2027 funding continues APNT development activities.

R-3 lines of work
  • Management Services
  • Product Development
  • Test and Evaluation
Funding trajectory

Project EG3 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

255075019.8FY25ACTUAL2.5FY26ENACTED54.1FY27REQUEST63.9FY2874.0FY298.6FY307.3FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual19.8
FY2026Enacted2.5
FY2027Request54.1
FY2028Outyear63.9
FY2029Outyear74.0
FY2030Outyear8.6
FY2031Outyear7.3
Inside the project

3 accomplishments / planned programs

The R-2A exhibit — the only level of the budget that describes work that has not happened yet. Activities carry the prior, current and budget year only, no five-year plan. 1 of them describes FY2027 work in enough detail to have its own page; the rest are shown here in full. Coverage is partial across the corpus, so count activities, never total them.

FY2025 actual$5.1M
FY2026 enacted$2.5M
FY2027 request$54.1M

FY 2027 continues the development and integration of an anti-jam module into the GMLRS and ER-GMLRS rockets to enable an initial anti-jam capability. FY 2027 funds also initiate studies, analyses, and performance specification development for hybrid software defined receiver to provide an adaptable solution for evolving threats.

Read the FY2027 plan →
GMLRS enhancements
FY2025 actual$1.8M
FY2026 enacted
FY2027 request

FY2025 accomplishments Complete component level design through critical design review (CDR), engineering development flight testing, and system level CDR. Completion of these activities will allow the program to transition to integration activities supporting ground and flight qualification tests. Software testing and materiel release activities will be ongoing for required Type Classification (TC) and Full Materiel Release (FMR) package submission supporting EAW production.

Extended Range (ER) GMLRS development
FY2025 actual$13.0M
FY2026 enacted
FY2027 request

FY2025 accomplishments Continue redesign and qualification of the new SMPS to include design verification testing and system qualification. Continues launcher software development support. Build flight termination systems to support operational test flights in FY 2026.