R-2A Activity · President's Budget PB2027

Family of Expeditionary Fuel Systems (FEFS)

FY2027 Request
$18.8M
▲ 1076% vs FY2026
HitchAI read

This activity requests $18.8M in FY2027, 63% of project 2503, up 1076% on FY2026. The R-2A exhibit describes it across FY2026–FY2027, including what the FY2027 money is planned to buy.

FY2027 Request
$18.8M
▲ 1076% vs FY2026
FY2026 Enacted
$1.6M
▼ 75% vs FY2025
FY2025 Actual
$6.5M
Prior year
Planned work

What the FY2027 request buys

Verbatim from the R-2A exhibit for project 2503 of PE 0206623M. This is the budget justification's own description of work that has not happened yet — the one thing no other level of the budget carries.

FY2027 planned work

- Complete the development and test alternative fuel distribution and storage technologies for Self-support Portable Distributed Refueling System (SPDRS) in support of EABO. - Continue development of the Fuel Automated Reporting System (FARS) Increment II, to provide automated fuel reporting integration with secure geo-location information and predictive analytics. - Continue testing and development of emerging technologies on legacy tactical fuel systems. - Initiate the development testing and evaluation of Six Containers (SIXCON) Fuel Pump Module prototypes to provide modular pumping capabilities to expeditionary forces. - Initiate the development and test of scalable, modular Beach Receiving Kit (BRK) protypes. - Initiate development of Collapsible Tank Inspection Kit (C-TIK) to provide an efficient, effective, and safe means to inflate, deflate, defuel, and inspect Collapsible Fabric Drums and Tanks. - Initiate the development of the Transportable Collapsible Bladder (TCB) to provide diverse, multi-modal bulk fuel transportation, storage, and distribution capabilities in support of expeditionary operations in a contested environment.

FY2026 to FY2027 change

The increase from FY 2026 to FY 2027 is targeted at closing key capability gaps in expeditionary fuel logistics. Specifically, advancing the development of Six Containers (SIXCON) Fuel Pump Module prototypes, Beach Receiving Kit (BRK) prototypes, Collapsible Tank Inspection Kit (C-TIK), and Transportable Collapsible Bladder (TCB).

Before the request year

FY2026: the year under way

Prior-year accomplishments and current-year plans from the same exhibit. Context for the FY2027 plan, not a series — an activity partitions its project exactly in the request year, but can under-cover it in earlier years.

FY2026 plans — current year

- Continued testing of sensor and meter for the Fuel Automated Reporting System (FARS) along with data analytics technologies for fuel systems in order to fulfill procurement actions necessary for Engineer Change Proposals (ECPs) of the legacy tactical fuel systems. - Continued the development and test alternative fuel distribution and storage technologies for Self-support Portable Distributed Refueling System (SPDRS) in support of EABO. - Completed the research and development of the LPDS capability developing sub-components, support testing and certifications to improve the system's technology readiness level.

Money

Three years, and no five-year plan

An R-2A activity publishes the prior year, the current year and the budget year. The FYDP outyears exist at project and program-element level and are deliberately absent here rather than inferred. Estimate types are colored and never summed into one figure.

06.5FY25ACTUAL1.6FY26ENACTED18.8FY27REQUEST
Actual Enacted Request
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual6.5
FY2026Enacted1.6
FY2027Request18.8

This activity is 63% of project 2503's FY2027 request and 24% of PE 0206623M's. In the request year the activities under a project sum to it exactly; in the current year they under-cover it in about 9% of cases, so an activity's delta can legitimately exceed its parent's and the two must not be compared row to row.

Where this sits

8 activities in project 2503

Every R-2A line of this project, largest FY2027 request first. Linked where the activity has enough of its own narrative to carry a page; the rest are shown in full on the project page.

Family of Expeditionary Fuel Systems (FEFS) — this activity$18.8M ▲ 1076%
Family of Field Medical Equipment (FFME)$6.3M ▲ 204%
Family of Expeditionary Waters Systems (FEWS)$3.5M RESTART
Marine Corps Uniforms (MCU)$0.6M ▼ 6%
Load Bearing and Pack Systems (LBPS)$0.3M ▲ 97%
Calibration and Maintenance Program (CAMP)$0.2M ▲ 19%
Family of Combat Field Feeding (FCFFS)$0.1M ▲ 1%
Family of Shelters and Shelter Equipment (FSSE)$0.0M ▼ 27%
Source
FY2027 Department of the Navy RDT&E Budget Justification · Exhibit R-2A · PE 0206623M, project 2503 (President's Budget PB2027). Congressional marks are recorded on the program element, never on an activity.