# Advanced Technology Development (ATD)

**R-2A activity** of project 674785 — F-22  
**Program element:** 0207138F — F-22  
**Component:** U.S. Air Force · **Budget Activity:** 7  
**Vintage:** President's Budget PB2027  
**Canonical URL:** https://hitchintel.com/programs/0207138F/674785/a1  
**Parent:** https://hitchintel.com/programs/0207138F

## Summary

This activity requests $26.7M in FY2027, 2.8% of project 674785, up 26% on FY2026. The R-2A exhibit describes it across FY2026–FY2027, including what the FY2027 money is planned to buy.

## What the FY2027 request buys

**FY2027 planned work.** Complete development of high-bandwidth beyond-line-of-sight demonstration satellite communications capabilities. Continue annual, on-going, technology maturation, development and risk reduction projects in support of various F-22 development efforts.

**FY2026 to FY2027 change.** Increase of $5.537 million from FY2026 to FY2027 reflects the increase of high-bandwidth beyond-line-of-sight demonstration satellite communications capabilities work, and furthering technology maturation testing activity.

## Before the request year

**FY2026 plans — current year.** Continue technology maturation, development and risk reduction projects in support of various F-22 development efforts. Examples include, but are not limited to, continued development of high-bandwidth beyond-line-of-sight satellite communications, assessments of emerging systems and tactics development, and system hardware development and testing. Project Geyser+ continued flight demonstrations to support technology maturation and continued hardware design analysis to inform production configuration and integration requirements for Engineering and Manufacturing Development (EMD).

## Funding

| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 41.4 |
| FY2026 | Enacted | 21.2 |
| FY2027 | Request | 26.7 |

> Prior, current and budget year only — an R-2A activity carries no five-year plan. It sums exactly into its project in the request year and not necessarily in any other.

## Other activities in project 674785

- [Infrastructure](https://hitchintel.com/programs/0207138F/674785/a0) — FY2027 325.3
- [Software Pathway for Enabling Expedited Deliveries (SPEED)](https://hitchintel.com/programs/0207138F/674785/a11) — FY2027 243.9
- [Viability](https://hitchintel.com/programs/0207138F/674785/a8) — FY2027 109.6
- [Sensor Systems](https://hitchintel.com/programs/0207138F/674785/a2) — FY2027 106.7
- [Cryptographic Modernization](https://hitchintel.com/programs/0207138F/674785/a9) — FY2027 49.0
- [Hybrid Satellite Communication (SATCOM)](https://hitchintel.com/programs/0207138F/674785/a10) — FY2027 36.8
- [Low Drag Tanks and Pylons (LDTP)](https://hitchintel.com/programs/0207138F/674785/a7) — FY2027 34.0
- Mode 5 Identify Friend or Foe Challenge (IFFC) — FY2027 9.2
- Embedded GPS/Inertial Navigation System (INS) Modernization (EGI-M) — FY2027 6.8
- Controlled Reception Pattern Antenna (CRPA)/Anti-Jam Global Positioning System (GPS) Antenna — FY2027 2.3
- Link 16 (L16) and Open System Architecture (OSA) Increment II Improvements — FY2027 0.0

## Source & machine access

- **Source:** FY2027 Department of the Air Force RDT&E Budget Justification, Exhibit R-2A, PE 0207138F project 674785 (PB PB2027). Narrative is the government's own text.
- **No marks, no contractors at this grain** — congressional marks land on the program element and R-3 performers on the project.
- **MCP:** `mcp.hitchintel.com` — `budget_get_activity`.

*HitchAI is an independent intelligence service, not affiliated with the U.S. Department of Defense. Budget figures are requests/estimates, not obligations.*