RDT&E Project · President's Budget PB2027

Unmanned Carrier Aviation Mission Control System

Project 3279·PE 0207255N — MQ-25 Stingray·U.S. Navy·BA7
FY2027 Request
$73.0M
◆ New start in FY2027
HitchAI read

Project 3279 — Unmanned Carrier Aviation Mission Control System requests $73.0M in FY2027, 14% of the $513.3M requested for program element 0207255N — a new start, with no prior-year and no current-year money. 1 R-2A activity decomposes the request, 1 new this cycle. Lockheed Martin is the largest named R-3 performer at $48.0M, 66% of the project's FY2027 R-3 total.

New start

This project requests $73.0M in FY2027 with no prior-year and no current-year funding. There is no incumbent line to compare it with — it did not exist before this President's Budget.

MarketUncrewed & Autonomy

Matched on this project's title. A title match, not a curated taxonomy — narrative-only matches are not shown at all rather than shown with a caveat nobody reads. No market size is quoted here: a market spans appropriations far beyond this program element.

FY2027 Request
$73.0M
No FY2026 funding
FY2026 Enacted
$0.0M
No FY2025 funding
FY2025 Actual
$0.0M
Prior year
Project detail

What project 3279 buys

The Unmanned Carrier Aviation (UCA) Mission Control System (UMCS) program develops, modifies, builds, integrates, and installs control systems, afloat and ashore, required to operate the MQ-25A, Collaborative Combat Aircraft (CCA) and future unmanned systems. UMCS will have to modify existing systems or develop new capabilities to support the control of different unmanned systems. With limited space on the aircraft carriers, the control station software will be modified to enable control of multiple aircraft from a single cockpit. The Unmanned Carrier Aviation Mission Control System program includes what was previously identified as the Control System & Connectivity (CS&C) and Carrier Vessel, Nuclear (CVN) Integration (CVNI) Segments previously captured under the MQ-25 Development PU 3278. The UMCS program, PU 3279, is the system-of-systems required for MQ-25 vehicle and payload control both shipboard and shore based. UMCS consists of all ground and ship-based hardware, software, and networks associated with the planning and execution of flight operations and tactical missions. In addition to the Ground Control Station (GCS), consisting of Air Vehicle Pilot (AVP) workstations and servers, the UMCS program builds hardware to support line of sight (LOS) communications, beyond line of sight (BLOS) satellite communications (SATCOM), and integration with ship/shore-based systems. There are three variants of the GCS: MD-5C (CVN-based), MD-5D (Shore-based) and MD-5E (Embarkable system) for use on CVNs that do not yet have permanent GCS systems installed. UMCS leverages existing Programs of Record for network integration and LOS/BLOS communications and builds MQ-25 unique systems (e.g. an ARC-210 based LOS communication system and a Video Management System (VidMS) for AVO situational awareness). The GCS, with a dedicated manufacturer for the core component, allows for streamlined software development, supports multiple classification levels, and positions MQ-25A interoperability with other DoW systems. Hardware development and fabrication is one facet of the program. UMCS develops and integrates software and modifies several aircraft carrier spaces to install and integrate the GCS and communication systems, in support of MQ-25A test events and operations aboard select NIMITZ Class CVNs.

R-3 lines of work
  • Product Development
Funding trajectory

Project 3279 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

25507500.0FY25ACTUAL0.0FY26ENACTED73.0FY27REQUEST90.1FY2881.9FY2977.8FY3078.7FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual0.0
FY2026Enacted0.0
FY2027Request73.0
FY2028Outyear90.1
FY2029Outyear81.9
FY2030Outyear77.8
FY2031Outyear78.7
Inside the project

1 accomplishment / planned program

The R-2A exhibit — the only level of the budget that describes work that has not happened yet. Activities carry the prior, current and budget year only, no five-year plan. Each describes FY2027 work in enough detail to have its own page; the rest are shown here in full. Coverage is partial across the corpus, so count activities, never total them.

FY2025 actual$0.0M
FY2026 enacted$0.0M
FY2027 request$73.0M

Includes Government and Lockheed Martin software development to enable MQ-25A to the fleet. These funds support: -Software Development: Continued software development essential for supporting all flight tests leading to first deployment -Software Licensing: Procure and maintain EMD software licenses -System Administrator: Continued…

Read the FY2027 plan →
Who's building it

Named performers on project 3279

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

Lockheed Martin
$48.0M · 66%
NAWCAD
$21.3M · 29%