RDT&E Project · President's Budget PB2027

Adv Beam Control Component Development for C-CM

FY2027 Request
$11.1M
▲ 101% vs FY2026
HitchAI read

Project DE3 — Adv Beam Control Component Development for C-CM requests $11.1M in FY2027, 31% of the $36.1M requested for program element 0602150A, up 101% on FY2026. 1 R-2A activity decomposes the request.

FY2027 Request
$11.1M
▲ 101% vs FY2026
FY2026 Enacted
$5.5M
▲ 6.6% vs FY2025
FY2025 Actual
$5.2M
Prior year
Project detail

What project DE3 buys

This project researches and develops advanced beam control technologies to enable new sensors, illuminators, deformable mirrors, wavefront sensors (WFS), optical components, and acquisition and tracking concepts. Design and develop an advanced large-aperture off-axis beam expander, incorporating innovative, cost-saving component research. Develop algorithms for WFS and laser-quality tracking. This effort will increase effective range for multi-domain missions, including counter-cruise missile operations and strategic missions. Work in this Project complements (PE) 0602150A (Air and Missile Defense Technology)/Project DC1 (Next Generation Directed Energy Concept Development and Analysis) and PE 0603466A (Air and Missile Defense Advanced Technology)/Project IB1 (Integrated Beam Control Systems Demonstration for Counter-Cruise Missile). The cited work aligns with the 2026 National Defense Strategy of Protecting the Homeland borders and skies and the Modernization of Missile Defense both priority lines of effort. The work also aligns with the Army Modernization Priority of Air and Missile Defense in developing advanced systems to protect against aerial threats. Research is performed by the U.S. Army Space and Missile Defense Command - Technical Center (USASMDC-TC) in coordination with Program Acquisition Executive (PAE) FIRES.

Funding trajectory

Project DE3 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

05.2FY25ACTUAL5.5FY26ENACTED11.1FY27REQUEST10.3FY2810.3FY2910.4FY3010.5FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual5.2
FY2026Enacted5.5
FY2027Request11.1
FY2028Outyear10.3
FY2029Outyear10.3
FY2030Outyear10.4
FY2031Outyear10.5
Inside the project

1 accomplishment / planned program

The R-2A exhibit — the only level of the budget that describes work that has not happened yet. Activities carry the prior, current and budget year only, no five-year plan. Each describes FY2027 work in enough detail to have its own page; the rest are shown here in full. Coverage is partial across the corpus, so count activities, never total them.

FY2025 actual$5.2M
FY2026 enacted$5.5M
FY2027 request$11.1M

Continue to enhance strategic capabilities, commence with the design and development of advanced beam control technologies and algorithms. This effort will prioritize the development of critical component-level concepts to facilitate integration into larger aperture systems. Simultaneously, establish a stabilized pointing environment…

Read the FY2027 plan →