R-2A Activity · President's Budget PB2027

Weapons Technology

FY2027 Request
$12.0M
◆ New start in FY2027
HitchAI read

This activity requests $12.0M in FY2027, 24% of project 2912 — a new start with no prior-year and no current-year money. The R-2A exhibit describes it across FY2027, including what the FY2027 money is planned to buy.

New start

This activity requests $12.0M in FY2027 with no prior-year and no current-year funding. There is no incumbent line to compare it with — it did not exist before this President's Budget.

FY2027 Request
$12.0M
No FY2026 funding
FY2026 Enacted
$0.0M
No FY2025 funding
FY2025 Actual
$0.0M
Prior year
Planned work

What the FY2027 request buys

Verbatim from the R-2A exhibit for project 2912 of PE 0603123N. This is the budget justification's own description of work that has not happened yet — the one thing no other level of the budget carries.

FY2027 planned work

Initiate: - Evaluation and integration of rotating detonation engine (RDE) technology in propulsion systems for next-generation Naval strike systems. - Preliminary design, prototyping, and testing of an RDE test article with a supersonic inlet, diffuser, and nozzle to assess integrated propulsion system performance. - Conceptual design of strike system all-up-round and characterization of system performance. - Evaluation of material and thermal management solutions to demonstrate long-duration RDE operation. - Studies in military utility analysis and application of novel air breathing propulsion technologies.

FY2026 to FY2027 change

The increase from FY26 to FY27 is to accelerate weapons technology maturation, prototyping, system integration, and mission utility studies for advanced tactical propulsion, including rotating detonation engine (RDE) technologies for Navy-relevant applications. This increase directly supports Department of the Navy (DoN) priorities for developing next-generation strike capabilities, which in turn aligns with broader DoW objectives for affordable mass munitions and technology acceleration. This investment leverages prior applied research investments and is not a new start.

Money

Three years, and no five-year plan

An R-2A activity publishes the prior year, the current year and the budget year. The FYDP outyears exist at project and program-element level and are deliberately absent here rather than inferred. Estimate types are colored and never summed into one figure.

00.0FY25ACTUAL0.0FY26ENACTED12.0FY27REQUEST
Actual Enacted Request
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual0.0
FY2026Enacted0.0
FY2027Request12.0

This activity is 24% of project 2912's FY2027 request and 24% of PE 0603123N's. In the request year the activities under a project sum to it exactly; in the current year they under-cover it in about 9% of cases, so an activity's delta can legitimately exceed its parent's and the two must not be compared row to row.

Where this sits

4 activities in project 2912

Every R-2A line of this project, largest FY2027 request first. Linked where the activity has enough of its own narrative to carry a page; the rest are shown in full on the project page.

Surface Ship and Submarine Hull Mechanical and Electrical (HM&E)$30.2M ▲ 23%
Weapons Technology — this activity$12.0M NEW
Aircraft Technology$6.3M ▼ 67%
Mission Capable and Survivable Force$2.4M NEW
Source
FY2027 Department of the Navy RDT&E Budget Justification · Exhibit R-2A · PE 0603123N, project 2912 (President's Budget PB2027). Congressional marks are recorded on the program element, never on an activity.
Machine access