R-2A Activity · President's Budget PB2027

MALE Primary Hardware/Software Development/Integration

Activity a0·Project 3448 — Marine Group 5 UAS Development·PE 0603128N·U.S. Navy
FY2027 Request
$19.1M
▲ 93% vs FY2026
HitchAI read

This activity requests $19.1M in FY2027, 54% of project 3448, up 93% on FY2026. The R-2A exhibit describes it across FY2026–FY2027, including what the FY2027 money is planned to buy.

FY2027 Request
$19.1M
▲ 93% vs FY2026
FY2026 Enacted
$9.9M
▼ 78% vs FY2025
FY2025 Actual
$44.7M
Prior year
Planned work

What the FY2027 request buys

Verbatim from the R-2A exhibit for project 3448 of PE 0603128N. This is the budget justification's own description of work that has not happened yet — the one thing no other level of the budget carries.

FY2027 planned work

MALE funding will advance the MQ-9A's capabilities by supporting the design, integration, and prototyping of payloads and sensors. These funds will also be used for ongoing development, testing, and the refinement of technical requirements to ensure the system's spiral development can rapidly integrate new technologies to counter evolving threats.

FY2026 to FY2027 change

An increase from FY2026 to FY2027 of $9.222 million is requested, with the majority allocated to advancing the primary development of the MDA solution. This funding will support the continuation of platform, secure mission control element and ground control station integrations, the initiation of laboratory activities, and planning for flight demonstrations to validate maritime detection, tracking, and data fusion performance. Funding supports completion of system prototype, environmental validation, and airworthiness certification, cybersecurity accreditation, and developmental test and operational assessment. This budget increase also provides for spiral capability development to enhance and mature technology towards full operational capability, including the use of Artificial Intelligence and Machine Learning to stay ahead of threats and for DAAS system design updates to support FAA safety certification.

Before the request year

FY2026: the year under way

Prior-year accomplishments and current-year plans from the same exhibit. Context for the FY2027 plan, not a series — an activity partitions its project exactly in the request year, but can under-cover it in earlier years.

FY2026 plans — current year

MALE will support MQ-9A capability and payloads/sensors integration and continued development, Non-Recurring Engineering (NRE), design work, software upgrades, and Air Vehicle and Ground Control Station integration. MALE will also support programmatic, engineering, logistics, test, software baseline development and technical requirements refinement in support of spiral development and integration of payloads/sensors into the system required to pace evolving threats.

Money

Three years, and no five-year plan

An R-2A activity publishes the prior year, the current year and the budget year. The FYDP outyears exist at project and program-element level and are deliberately absent here rather than inferred. Estimate types are colored and never summed into one figure.

25044.7FY25ACTUAL9.9FY26ENACTED19.1FY27REQUEST
Actual Enacted Request
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual44.7
FY2026Enacted9.9
FY2027Request19.1

This activity is 54% of project 3448's FY2027 request and 54% of PE 0603128N's. In the request year the activities under a project sum to it exactly; in the current year they under-cover it in about 9% of cases, so an activity's delta can legitimately exceed its parent's and the two must not be compared row to row.

Where this sits

3 activities in project 3448

Every R-2A line of this project, largest FY2027 request first. Linked where the activity has enough of its own narrative to carry a page; the rest are shown in full on the program-element page.

MALE Primary Hardware/Software Development/Integration — this activity$19.1M ▲ 93%
MALE Mission Systems Payload Support$12.5M ▲ 4%
MALE Developmental and Operational Test$4.1M ▼ 37%
Source
FY2027 Department of the Navy RDT&E Budget Justification · Exhibit R-2A · PE 0603128N, project 3448 (President's Budget PB2027). Congressional marks are recorded on the program element, never on an activity.