RDT&E Project · President's Budget PB2027

National Technical Nuclear Forensics

FY2027 Request
$17.9M
▼ 25% vs FY2026
HitchAI read

Project 040 — National Technical Nuclear Forensics requests $17.9M in FY2027, 40% of the $44.7M requested for program element 0603161D8Z, down 25% on FY2026. 1 R-2A activity decomposes the request.

MarketNuclear Modernization

Matched on this project's title. A title match, not a curated taxonomy — narrative-only matches are not shown at all rather than shown with a caveat nobody reads. No market size is quoted here: a market spans appropriations far beyond this program element.

FY2027 Request
$17.9M
▼ 25% vs FY2026
FY2026 Enacted
$23.8M
▼ 18% vs FY2025
FY2025 Actual
$29.1M
Prior year
Project detail

What project 040 buys

Per National Security Presidential Memorandum 35, the Department of War (DoW) leads the United States Government (USG) post-detonation National Technical Nuclear Forensics (NTNF) capability and directs the U.S. to maintain and advance NTNF capabilities leading to the attribution of the source of an actual or attempted nuclear attack in all environments. Per the 2022 Nuclear Posture Review, greater investment in NTNF tools is required to ensure they remain responsive to the threat. Per DoDD S-2060.04, OUSW(A&S) is the DoW office responsible for DoW’s NTNF capabilities. Per the FY 2022 – FY 2026 Nuclear Forensics Analysis System Plan, accelerated timelines are required for the NTNF capability to collect, analyze, and evaluate both air and ground post-nuclear detonation samples. This program is the only DoW RDT&E program focused on Advanced Component Development & Prototypes for NTNF capabilities. Collecting analyzing and evaluating post-detonation prompt signals and nuclear debris is critical to ensure the USG can identify the source of nuclear material and holding those involved or supporting an attack accountable is critical to our national defense and security. Swift and accurate forensic and attribution capabilities are vital to supporting the President and Secretary of War in developing an appropriate, and timely, national response to a nuclear event and to prevent future attacks. An effective NTNF capability ensures potential adversaries, or those who support them, know that they will be held accountable if they use proxies or other non-traditional delivery (e.g., false-flag operations) of nuclear weapons against the U.S., U.S. interests, or allies. Both internal and independent studies indicate that continued improvement to the USG's NTNF capabilities is needed to sustain a credible deterrent against an attempted or actual nuclear attack. Additionally, this program sustains perishable U.S. technical expertise at the operational DoW laboratories required to respond to a post-detonation NTNF event. The DoW's laboratory capability in this area is limited by capacity and technical expertise.

R-3 lines of work
  • Product Development
  • Management Services
Funding trajectory

Project 040 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

25029.1FY25ACTUAL23.8FY26ENACTED17.9FY27REQUEST15.6FY2815.7FY2916.1FY3016.5FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual29.1
FY2026Enacted23.8
FY2027Request17.9
FY2028Outyear15.6
FY2029Outyear15.7
FY2030Outyear16.1
FY2031Outyear16.5
Inside the project

1 accomplishment / planned program

The R-2A exhibit — the only level of the budget that describes work that has not happened yet. Activities carry the prior, current and budget year only, no five-year plan. Each describes FY2027 work in enough detail to have its own page; the rest are shown here in full. Coverage is partial across the corpus, so count activities, never total them.

FY2025 actual$29.1M
FY2026 enacted$23.8M
FY2027 request$17.9M

- Continue RDT&E investments in the collection, analysis, and evaluation of ground and airborne post-detonation debris samples. -- Continue to support collection: Improve ground collection capabilities and tools to accelerate mission timelines. -- Continue to support analysis: Improve debris and prompt signals analysis capabilities and…

Read the FY2027 plan →