RDT&E Project · President's Budget PB2027

METOC Data Assimilation and Mod

FY2027 Request
$16.3M
▲ 47% vs FY2026
HitchAI read

Project 2342 — METOC Data Assimilation and Mod requests $16.3M in FY2027, 21% of the $76.1M requested for program element 0603207N, up 47% on FY2026. 1 R-2A activity decomposes the request. NRL is the largest named R-3 performer at $10.1M, 62% of the project's FY2027 R-3 total.

FY2027 Request
$16.3M
▲ 47% vs FY2026
FY2026 Enacted
$11.1M
▼ 43% vs FY2025
FY2025 Actual
$19.6M
Prior year
Project detail

What project 2342 buys

The Battlespace Data Assimilation and Prediction Project (2342) enables the future warfighter to leverage observed environmental data gathered under Project 2341 (METOC Data Acquisition) by assimilating data into and fusing them with sophisticated high-resolution (spatial and temporal) assessment and prediction models made possible by high-performance computing. These models gain increasing importance as weapons and sensors grow in sophistication and complexity, making them even more sensitive to the effects of the natural environment. Meteorology and Oceanography (METOC) Processing enables full understanding of the limitations and constraints imposed by ocean and atmosphere, in space and time, thus quantifying and minimizing their impact on weapons, sensors, and mission. However, METOC Processing itself is limited by the temporal and spatial resolutions at which data are collected and numerically analyzed and predicted. Thus Projects 2341 and 2342 must remain aggressive in delivering higher and higher resolutions, demanding greater and greater computational and database capacities. METOC Processing efforts must also rise to the challenge of assimilating smaller-scale phenomena, particularly in the littorals, and predicting their spatial and temporal effects, as stated by Fleet and Force Commanders who require remote autonomous, clandestine, littoral battlespace sensing in near-shore areas to enable Sea Shield & Sea Basing. This next step in the Information Warfare (IW) Tasking, Collection, Processing, Exploitation and Dissemination (TCPED) continuum, METOC Processing, is critical to fully characterize the physical battlespace environment in real-time and in predictive/forecasting modes and gives the warfighter a decisive advantage in the complex blue-water, littoral and deep-strike battlespaces.

R-3 lines of work
  • Product Development
  • Support
  • Test and Evaluation
  • Management Services
Funding trajectory

Project 2342 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

019.6FY25ACTUAL11.1FY26ENACTED16.3FY27REQUEST17.8FY2817.1FY2917.1FY3017.4FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual19.6
FY2026Enacted11.1
FY2027Request16.3
FY2028Outyear17.8
FY2029Outyear17.1
FY2030Outyear17.1
FY2031Outyear17.4
Inside the project

1 accomplishment / planned program

The R-2A exhibit — the only level of the budget that describes work that has not happened yet. Activities carry the prior, current and budget year only, no five-year plan. Each describes FY2027 work in enough detail to have its own page; the rest are shown here in full. Coverage is partial across the corpus, so count activities, never total them.

FY2025 actual$19.6M
FY2026 enacted$11.1M
FY2027 request$16.3M

-Continue to mature ensemble global environmental prediction models. This includes adapting the next-generation NEPTUNE (Navy Environmental Prediction System Using a Nonhydrostatic Engine) atmospheric model for ensemble use and integrating NEPTUNE as the atmospheric component of the Earth Prediction Capability (ESPC) coupled global…

Read the FY2027 plan →
Who's building it

Named performers on project 2342

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

NRL
$10.1M · 62%
SSC PAC
$1.9M · 12%