## Summary

Project 2486 — BBG(X) Integrated Power Systems requests $251.0M in FY2027, 93% of the $270.0M requested for program element 0603573N — a new start, with no prior-year and no current-year money. 1 R-2A activity decomposes the request, 1 new this cycle. Industry is the largest named R-3 performer at $90.6M, 36% of the project's FY2027 R-3 total.

## Funding profile

| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 0.0 |
| FY2026 | Enacted | 0.0 |
| FY2027 | Request | 251.0 |
| FY2028 | Outyear | 224.0 |
| FY2029 | Outyear | 249.5 |
| FY2030 | Outyear | 352.2 |
| FY2031 | Outyear | 349.2 |

> Estimate types are not summed. This project is one leaf of PE 0603573N; the PE total is the sum of its projects, never added to them.

## What project 2486 buys

The Guided Missile Battleship (BBG(X)) program supports the expansion and modernization of the Nation's large surface combatant fleet, reinforcing maritime dominance. The Battleship is based on the validated requirement for high-end surface capability directly supporting the Navy Warfighting Concept (NWC) and Expanded Maritime Maneuver (EMM) that cannot be met by current fleet assets. Adding capability at the highest end of the Golden Fleet high-low mix, the Battleship's primary role is to deliver high-volume, long-range offensive fires and serve as a robust, survivable forward command and control platform. The expanded size and energy density of the new Battleship provide critical advantages for future naval warfare, offering a future-proof platform with distinct capabilities that enhance deterrence. Its advanced systems will enable true long-range strike with hypersonic weapons housed in new, larger vertical launch systems. Vastly increased power generation, managed by a sophisticated integrated power system with high-capacity energy storage, will support mission-critical directed energy weapons like high-output lasers and electromagnetic railguns, reducing reliance on costly single-use munitions. Furthermore, its advanced naval gunfire offers cost-effective options for strike and defense, and its capacity to embark a fleet command staff enhances survivability by putting commanders closer to the fight. As a flexible command-and-control platform for both manned and unmanned platforms, the Battleship can lead a Surface Action Group, integrate with a Carrier Strike Group, or operate autonomously to secure critical sea lanes. To overcome the capacity limits of the Arleigh Burke-class destroyer and the capability compromises of the planned DDG(X), the Battleship is designed specifically to accommodate these advanced weapon systems. The ship's architecture provides the foundational space, weight, power, and cooling for five large weapon stations, enabling the integration of large-format missile launchers, railguns, and high-energy lasers that cannot be incorporated within legacy platforms. The design ensures room for future technological advancements and sends an unmistakable signal of American resolve, inspiring confidence in allies and fear in adversaries.

**R-3 lines of work:** Product Development; Management Services.

## Named R-3 performers

| Performer | $M | Share of this project's FY2027 R-3 total |
|---|---|---|
| Industry | 90.6 | 36% |
| Other Gov't Agencies | 52.0 | 21% |
| Gibbs & Cox | 29.6 | 12% |
| Shipbuilders | 25.2 | 10% |

> Budget-justification contract funding, not obligations. Shares need not reach 100% — unnamed and government work is in the denominator.

## Activities (R-2A) — 1

| Activity | FY2025 | FY2026 | FY2027 | Move | Page |
|---|---|---|---|---|---|
| BBG(X) Power & Propulsion Risk Mitigation & Demonstration | 0.0 | 0.0 | 251.0 | new | [a0](https://hitchintel.com/programs/0603573N/2486/a0) |

> Activities carry the prior, current and budget year only — no five-year plan. In the request year they partition this project exactly; in earlier years they can under-cover it.

### BBG(X) Power & Propulsion Risk Mitigation & Demonstration — NEW START

Continue BBG(X) power and propulsion risk reduction activities for land-based testing of propulsion systems in a realistic environment aligned with the BBG(X) IPS design efforts as part of BBG(X) Design Development efforts executed under PE 0603564N/ PU 0413. BBG(X) Power and Propulsion System Strategy completes design, test…

Full year-by-year narrative: https://hitchintel.com/programs/0603573N/2486/a0

## What is NOT on this page

Congressional marks, the R-2 mission description and acquisition strategy, the industry vs government split of the whole request, and related program elements are recorded at **program-element** grain — an NDAA mark lands on a PE, never on a project. They are at https://hitchintel.com/programs/0603573N.

## Source & machine access

- **Source:** FY2027 Department of the Navy RDT&E Budget Justification, Exhibits R-2/R-2A/R-3, PE 0603573N project 2486 (PB PB2027).
- **MCP:** `mcp.hitchintel.com` — `budget_get_program_element(pe="0603573N")`.