R-2A Activity · President's Budget PB2027

Systems Engineering, Test and Evaluation

FY2027 Request
$32.1M
▲ 38% vs FY2026
HitchAI read

This activity requests $32.1M in FY2027, 60% of project 3441, up 38% on FY2026. The R-2A exhibit describes it across FY2026–FY2027, including what the FY2027 money is planned to buy.

FY2027 Request
$32.1M
▲ 38% vs FY2026
FY2026 Enacted
$23.2M
▲ 31% vs FY2025
FY2025 Actual
$17.8M
Prior year
Planned work

What the FY2027 request buys

Verbatim from the R-2A exhibit for project 3441 of PE 0603595N. This is the budget justification's own description of work that has not happened yet — the one thing no other level of the budget carries.

FY2027 planned work

Ship Control, Hydrodynamics and Shock: - Continue simulation development focus on refining operational boundaries. - Support for SSM development. Propulsor and Shafting: - Continue analysis of data collected during modal testing of as-built propulsor components and assemblies to inform and improve computational models. - Update performance achievability assessments to reflect as-manufactured parts. - Support emergent design requirements during installation of propulsor components at the shipyard. - Continue testing of propulsor bearing first production unit at Full Scale Bearing Test Facility to evaluate performance and generate design feedback. - Continue design development and manufacturing feasibility studies for potential changes for shafting system components to implement on later hulls. Signatures: - Update whole-boat signature predictions using updated component modeling and predictive tools. - Support GFE design efforts for CLB ship system components and demonstration testing. - Update numerical modeling approaches to assess in-service electric signatures to reduce test time and prioritize maintenance decisions. - Provided to support GFE system tech refresh and integration into lead ship baseline and follow-on hulls based on lessons learned from future naval capability efforts and component acceptance and integration testing.

FY2026 to FY2027 change

- Increase due to alignment with the NRE RDT&E Requirements from the 2024 05C Cost Checkpoint, updated warfare center rate adjustments, and support of FY 2027 ship schedules.

Before the request year

FY2026: the year under way

Prior-year accomplishments and current-year plans from the same exhibit. Context for the FY2027 plan, not a series — an activity partitions its project exactly in the request year, but can under-cover it in earlier years.

FY2026 plans — current year

Ship Control, Hydrodynamics and Shock: - Support Ship Control Algorithm development to include SFA (Steady Flight Assist) - Continue to support development of 1st Ship Control Crew Trainer at EB, Groton, CT - Preparations to conduct the Large Scale Vehicle Test. - Continue simulation development focus on refining operational boundaries. - Support for SSM development. Diesel Exhaust: - Complete the Phase III material testing and characterization of the down selected material to verify material suitability for the Diesel Exhaust. - Complete the testing report and generate the Objective Quality Evidence to support a Material Selection Information submittal for NAVSEA approval. Propulsor and Shafting: - Continue analysis of data collected during modal testing of as-built propulsor components and assemblies to inform and improve computational models. - Update performance achievability assessments to reflect as-manufactured parts. - Support emergent design requirements during installation of propulsor components at the shipyard. - Continue testing of propulsor bearing first production unit at Full Scale Bearing Test Facility to evaluate performance and generate design feedback. - Continue design development and manufacturing feasibility studies for potential changes for shafting system components to implement on later hulls. Signatures: - Support GFE Ship System technology refresh for CLB lead ship. - Develop updated numerical modeling techniques to improve prediction capabilities and support reviews/assessments of Shipbuilder products by Subject Matter Experts. - Develop updated component modeling tools which support analysis and diagnostics of potential signature issues identified during ship construction, at-sea demonstration testing, and design changes. Mature modeling tools can reduce future time and costs associated with R&D testing of signatures-related issues.

Money

Three years, and no five-year plan

An R-2A activity publishes the prior year, the current year and the budget year. The FYDP outyears exist at project and program-element level and are deliberately absent here rather than inferred. Estimate types are colored and never summed into one figure.

25017.8FY25ACTUAL23.2FY26ENACTED32.1FY27REQUEST
Actual Enacted Request
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual17.8
FY2026Enacted23.2
FY2027Request32.1

This activity is 60% of project 3441's FY2027 request and 9.7% of PE 0603595N's. In the request year the activities under a project sum to it exactly; in the current year they under-cover it in about 9% of cases, so an activity's delta can legitimately exceed its parent's and the two must not be compared row to row.

Where this sits

2 activities in project 3441

Every R-2A line of this project, largest FY2027 request first. Linked where the activity has enough of its own narrative to carry a page; the rest are shown in full on the project page.

Source
FY2027 Department of the Navy RDT&E Budget Justification · Exhibit R-2A · PE 0603595N, project 3441 (President's Budget PB2027). Congressional marks are recorded on the program element, never on an activity.
Machine access
Markdown twin /programs/0603595N/3441/a1.md · MCP mcp.hitchintel.combudget_get_activity