# Project DK7 — 155mm Artillery Propulsion Mod - Adv Component Dev

**Program element:** 0603639A — Tank and Medium Caliber Ammunition  
**Project:** DK7  
**Component:** U.S. Army  
**Appropriation:** 2040 — RDT&E, Army  
**Budget Activity:** 4 — Advanced Component Development & Prototypes  
**Vintage:** President's Budget PB2027  
**Canonical URL:** https://hitchintel.com/programs/0603639A/DK7  
**Parent:** https://hitchintel.com/programs/0603639A

## Summary

Project DK7 — 155mm Artillery Propulsion Mod - Adv Component Dev requests $24.7M in FY2027, 8.9% of the $277.2M requested for program element 0603639A, up 139% on FY2026. 1 R-2A activity decomposes the request. DoW Ordnance is the largest named R-3 performer at $1.3M, 5.1% of the project's FY2027 R-3 total.

**Markets:** Ammunition & Explosives — matched on the project title only, and no market size is quoted.

## Funding profile

| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2026 | Enacted | 10.3 |
| FY2027 | Request | 24.7 |
| FY2028 | Outyear | 13.1 |

> Estimate types are not summed. This project is one leaf of PE 0603639A; the PE total is the sum of its projects, never added to them.

## What project DK7 buys

The 155mm Artillery Propulsion Modernization (Advanced Component Development) project supports the United States Army's Field Artillery modernization objectives by developing and maturing three propulsion system components: (1) modular charge that achieves minimum to intermediate ranges, (2) supercharge that achieves maximum range, and (3) percussion primer that initiates both the modular and supercharges. Development efforts also include the design of packaging solutions required for protection during transportation and long-term storage, digital engineering, test measurement devices and modeling and simulation tools. Design emphasis will shift from Joint Ballistic Memorandum of Understanding (JBMOU) compatibility to down selected Mobile Tactical Cannon (MTC) that maximizes interoperability with foreign allies, ensuring that the components support manufacturability within the National Technology and Industrial Base (NTIB). Fiscal Year (FY) 2027 funding will support continued prototyping and testing of propelling charges, combustible cases, additives, and ignition components to advance technologies that improve propellant effectiveness, extend cannon life, enhance primer and charge ignition performance, optimize system-level handling, rates of fire, and overall propulsion suitability and survivability.

**R-3 lines of work:** Management Services; Product Development; Support; Test and Evaluation.

## Named R-3 performers

| Performer | $M | Share of this project's FY2027 R-3 total |
|---|---|---|
| DoW Ordnance | 1.3 | 5.1% |
| Office of the Project Manager (PM) Comba | 0.3 | 1.2% |

> Budget-justification contract funding, not obligations. Shares need not reach 100% — unnamed and government work is in the denominator.

## Activities (R-2A) — 1

| Activity | FY2025 | FY2026 | FY2027 | Move | Page |
|---|---|---|---|---|---|
| 155mm Artillery Propulsion Modernization - Advanced Component Development | — | 10.3 | 24.7 | +139% | [a0](https://hitchintel.com/programs/0603639A/DK7/a0) |

> Activities carry the prior, current and budget year only — no five-year plan. In the request year they partition this project exactly; in earlier years they can under-cover it.

### 155mm Artillery Propulsion Modernization - Advanced Component Development

Fiscal Year (FY) 2027 funding will support continued prototyping and testing of propelling charges, combustible cases, additives, and ignition components to advance technologies and characterize performance with the down-selected Mobile Tactical Cannon (MTC) Platform.

Full year-by-year narrative: https://hitchintel.com/programs/0603639A/DK7/a0

## What is NOT on this page

Congressional marks, the R-2 mission description and acquisition strategy, the industry vs government split of the whole request, and related program elements are recorded at **program-element** grain — an NDAA mark lands on a PE, never on a project. They are at https://hitchintel.com/programs/0603639A.

## Source & machine access

- **Source:** FY2027 Department of the Army RDT&E Budget Justification, Exhibits R-2/R-2A/R-3, PE 0603639A project DK7 (PB PB2027).