# Project DN7 — Mobile Long Range Precision Strike Pgm (M-LRPSM)

**Program element:** 0603639A — Tank and Medium Caliber Ammunition  
**Project:** DN7  
**Component:** U.S. Army  
**Appropriation:** 2040 — RDT&E, Army  
**Budget Activity:** 4 — Advanced Component Development & Prototypes  
**Vintage:** President's Budget PB2027  
**Canonical URL:** https://hitchintel.com/programs/0603639A/DN7  
**Parent:** https://hitchintel.com/programs/0603639A

## Summary

Project DN7 — Mobile Long Range Precision Strike Pgm (M-LRPSM) requests $28.1M in FY2027, 10% of the $277.2M requested for program element 0603639A, up 371% on FY2026. 1 R-2A activity decomposes the request.

## Funding profile

| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2026 | Enacted | 6.0 |
| FY2027 | Request | 28.1 |
| FY2028 | Outyear | 20.1 |

> Estimate types are not summed. This project is one leaf of PE 0603639A; the PE total is the sum of its projects, never added to them.

## What project DN7 buys

DN7: The Mobile-Long Range Precision Strike Missile (M-LRPSM) is an approved Directed Requirement (DR). It must defeat Tier 1 thru Tier 3 Armor (stationary & defilade) Troops, Field Fortifications & Urban structures, and achieve a range of greater than 25 KM. It will be transportable by existing Infantry Brigade Combat Teams (IBCT) Light Tactical Vehicle platforms. It has the ability to adjust the missile flight, retarget, and abort, and have multiple missiles launch capability. It must be survivable and resilient in denied and degraded environments. The FY 2027 funding will provide system prototypes for candidate vendors and their participation in a flyoff demonstration. Following a down select one vendor at the end of the flyoff demonstration, FY 2027 funding will procure system prototypes to be used to conduct required testing to receive an Urgent Material Release.

**R-3 lines of work:** Management Services; Product Development; Test and Evaluation.

## Activities (R-2A) — 1

| Activity | FY2025 | FY2026 | FY2027 | Move | Page |
|---|---|---|---|---|---|
| M-LRPSM Development and Integration | — | 6.0 | 28.1 | +371% | — |

> Activities carry the prior, current and budget year only — no five-year plan. In the request year they partition this project exactly; in earlier years they can under-cover it.

### M-LRPSM Development and Integration

**FY2027 planned work.** FY2027 funding provides test assets for Vendor 2 and completes qualification testing of Vendor 1 initiated in FY2026

**FY2026 to FY2027 change.** The increase in funding represents the fabrication of Vendor 2 system prototypes required for qualification testing and completes the testing efforts being conducted for Vendor 1

**FY2026 plans — current year.** Product improvements based on continuous soldier involvement in the development and fielding of the M-LRPSM.

## What is NOT on this page

Congressional marks, the R-2 mission description and acquisition strategy, the industry vs government split of the whole request, and related program elements are recorded at **program-element** grain — an NDAA mark lands on a PE, never on a project. They are at https://hitchintel.com/programs/0603639A.

## Source & machine access

- **Source:** FY2027 Department of the Army RDT&E Budget Justification, Exhibits R-2/R-2A/R-3, PE 0603639A project DN7 (PB PB2027).
- **MCP:** `mcp.hitchintel.com` — `budget_get_program_element(pe="0603639A")`.