R-2A Activity · President's Budget PB2027

Advanced Electronics and Optics

FY2027 Request
$35.1M
▲ 138% vs FY2026
HitchAI read

This activity requests $35.1M in FY2027, 43% of project 680, up 138% on FY2026. The R-2A exhibit describes it across FY2025–FY2027, including what the FY2027 money is planned to buy.

FY2027 Request
$35.1M
▲ 138% vs FY2026
FY2026 Enacted
$14.8M
▼ 12% vs FY2025
FY2025 Actual
$16.8M
Prior year
Planned work

What the FY2027 request buys

Verbatim from the R-2A exhibit for project 680 of PE 0603680D8Z. This is the budget justification's own description of work that has not happened yet — the one thing no other level of the budget carries.

FY2027 planned work

Fund year 3 of 4 of Manufacturing Advances in the Scaling of Thin Electro-optic Resources for Making Integrated Niobate Devices (MASTERMIND), Year 2 of 3 for Fiber Laser-Attach for Manufacturability and Environmental Stability (FLAMES), Year 3 of 5 for Advanced Manufacturing of Thin Film Batteries, Year 3 of 3 for Automated Manufacturing of Small Format Liquid Reserve Batteries, Year 1 of 3 for Advanced Energy Storage System for Contested Logistics, Year 1 of 3 for High Energy Raman Lasers for Missile Defense, Year 1 of 3 for Manufacturing Infrared Arrays with Direct Bonding, Year 1 of 3 for Navigation Grade IMU for Precision Guided Munitions, and Year 1 of 4 for Superconducting MAGNAV with A-Axis Squid Arrays in HTS (SMASH). Additional funding being applied to beam steering optic components for high energy laser technologies to support directed energy applications.

FY2026 to FY2027 change

The increase of $20.372 million between FY 2026 and FY 2027 reflects a net increase of $15.000 million for Batteries for Key Systems for Thermal Batteries and an additional $5.372 million for a high energy laser technology initiative supporting beam steering and optical components in support of directed energy technologies is reflected as part of the year-to-year funding increase.

Before the request year

FY2025–FY2026: what came before

Prior-year accomplishments and current-year plans from the same exhibit. Context for the FY2027 plan, not a series — an activity partitions its project exactly in the request year, but can under-cover it in earlier years.

FY2026 plans — current year

Fund year 5 of 5 for Transmit/Receive Integrated System on a Chip (TRISoC) and Direct-write Manufacturing for Conformal Antennas, Year 3 of 3 for Advanced Pulse Power Solutions, Year 2 of 3 for Optically Based Enhancements for Accurate Mechanical Sensors (O-Beams) and Automated Manufacturing of Small Format Liquid Reserve Batteries.

FY2025 accomplishments

Fund year 4 of 5 for Transmit/Receive Integrated System on a Chip (TRISoC) and Direct-Write Manufacturing for Conformal Antennas, Year 3 of 3 for CEPSIS, High Voltage Materials for Thermal Batteries, CMOS Signal for Hypersonic Platforms, BLADE, Year 2 of 2 for Focal Plane Array Output, Year 2 of 3 for Advanced Pulse Power Solutions, and Year 1 of 3 for Optically Based Enhancements for Accurate Mechanical Sensors (O-Beams) and Automated Manufacturing of Small Format Liquid Reserve Batteries.

Money

Three years, and no five-year plan

An R-2A activity publishes the prior year, the current year and the budget year. The FYDP outyears exist at project and program-element level and are deliberately absent here rather than inferred. Estimate types are colored and never summed into one figure.

25016.8FY25ACTUAL14.8FY26ENACTED35.1FY27REQUEST
Actual Enacted Request
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual16.8
FY2026Enacted14.8
FY2027Request35.1

This activity is 43% of project 680's FY2027 request and 6.0% of PE 0603680D8Z's. In the request year the activities under a project sum to it exactly; in the current year they under-cover it in about 9% of cases, so an activity's delta can legitimately exceed its parent's and the two must not be compared row to row.

Where this sits

4 activities in project 680

Every R-2A line of this project, largest FY2027 request first. Linked where the activity has enough of its own narrative to carry a page; the rest are shown in full on the project page.

Advanced Materials and Composites$36.2M ▲ 342%
Advanced Electronics and Optics — this activity$35.1M ▲ 138%
Advanced and Emerging Manufacturing Processes$8.9M flat
Advanced Energetics Manufacturing$1.4M flat
Source
FY2027 Office of the Secretary of Defense RDT&E Budget Justification · Exhibit R-2A · PE 0603680D8Z, project 680 (President's Budget PB2027). Congressional marks are recorded on the program element, never on an activity.