# Project G11 — Adv Elec Energy Con Ad

**Program element:** 0603804A — Logistics and Engineer Equipment - Adv Dev  
**Project:** G11  
**Component:** U.S. Army  
**Appropriation:** 2040 — RDT&E, Army  
**Budget Activity:** 4 — Advanced Component Development & Prototypes  
**Vintage:** President's Budget PB2027  
**Canonical URL:** https://hitchintel.com/programs/0603804A/G11  
**Parent:** https://hitchintel.com/programs/0603804A

## Summary

Project G11 — Adv Elec Energy Con Ad requests $3.0M in FY2027, 23% of the $12.8M requested for program element 0603804A, down 89% on FY2026. 2 R-2A activities decompose the request. C5ISR is the largest named R-3 performer at $2.9M, 96% of the project's FY2027 R-3 total.

## Funding profile

| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 11.3 |
| FY2026 | Enacted | 27.8 |
| FY2027 | Request | 3.0 |
| FY2028 | Outyear | 3.0 |
| FY2029 | Outyear | 3.0 |
| FY2030 | Outyear | 3.0 |
| FY2031 | Outyear | 3.0 |

> Estimate types are not summed. This project is one leaf of PE 0603804A; the PE total is the sum of its projects, never added to them.

## What project G11 buys

As the DoW's Lead Standardization Activity for Tactical Electric Power (TEP), Project Manager Expeditionary Energy & Sustainment Systems (PM E2S2) matures and integrates technology that will improve the next generation of standard tactical power sources in support of all Services. It supports technical maturation of TEP systems that will extend Army operational mission reach and duration in support of the Army Operating Concept and Multi-Domain Battle. Funding supports modernization of the current Tactical Electric Power capability with technology insertions including, but not limited to advanced power technology capabilities through the Universal Power Gateway (UPG) system, light-weight power solutions, vehicle/tactical microgrid interoperability and Tactical Microgrid Standard (TMS). Funding also supports developing initial prototypes to enable refinement of Operational Requirements and early user feedback to support future sustainment and operational energy concepts. This project is a Congressional Interest Item. Congressionally provided funds will support analysis and planning for transition to the Army of the mobile micro-reactor prototype and capability and planning for Executive Agency. FY27 funding supports Advanced Power Technology for the Universal Power Gateway (UPG) requirement Abbreviated Capability Development Document (A-CDD) and continued analysis of transitioning micro-reactor technology to the Army.

**R-3 lines of work:** Management Services; Product Development; Support; Test and Evaluation.

## Named R-3 performers

| Performer | $M | Share of this project's FY2027 R-3 total |
|---|---|---|
| C5ISR | 2.9 | 96% |

> Budget-justification contract funding, not obligations. Shares need not reach 100% — unnamed and government work is in the denominator.

## Activities (R-2A) — 2

| Activity | FY2025 | FY2026 | FY2027 | Move | Page |
|---|---|---|---|---|---|
| Advanced Power Technology for the Universal Power Gateway (UPG) requirement | — | 2.8 | 3.0 | +8% | — |
| Grounding AC/DC Inverter Systems | 1.3 | — | — | — | — |

> Activities carry the prior, current and budget year only — no five-year plan. In the request year they partition this project exactly; in earlier years they can under-cover it.

### Advanced Power Technology for the Universal Power Gateway (UPG) requirement

**FY2027 planned work.** FY 2027 funding supports continued maturation efforts and testing of advanced power technologies.

**FY2026 to FY2027 change.** Increase in funding from FY 2026 to FY 2027 due to additional performance, environmental and interoperability testing efforts.

**FY2026 plans — current year.** FY 2026 funding supports technology maturation efforts for advanced power technologies (i.e. energy storage and power conversion) through Universal Power Gateway (UPG) development.

## What is NOT on this page

Congressional marks, the R-2 mission description and acquisition strategy, the industry vs government split of the whole request, and related program elements are recorded at **program-element** grain — an NDAA mark lands on a PE, never on a project. They are at https://hitchintel.com/programs/0603804A.

## Source & machine access

- **Source:** FY2027 Department of the Army RDT&E Budget Justification, Exhibits R-2/R-2A/R-3, PE 0603804A project G11 (PB PB2027).
- **MCP:** `mcp.hitchintel.com` — `budget_get_program_element(pe="0603804A")`.