R-2A Activity · President's Budget PB2027

Next Generational Adaptive Propulsion (NGAP)

Activity a0·Project 640864 — Next Generation Adaptive Propulsion (NGAP)·PE 0604010F·U.S. Air Force
FY2027 Request
$513.7M
▲ 58% vs FY2026
HitchAI read

This activity requests $513.7M in FY2027, 100% of project 640864, up 58% on FY2026. The R-2A exhibit describes it across FY2026–FY2027, including what the FY2027 money is planned to buy.

FY2027 Request
$513.7M
▲ 58% vs FY2026
FY2026 Enacted
$326.0M
▼ 33% vs FY2025
FY2025 Actual
$489.7M
Prior year
Planned work

What the FY2027 request buys

Verbatim from the R-2A exhibit for project 640864 of PE 0604010F. This is the budget justification's own description of work that has not happened yet — the one thing no other level of the budget carries.

FY2027 planned work

- Complete purchasing materials and component rig testing. - Continue fabricating components and finalize assembly planning. - Initiate prototype engine assembly and instrumentation.

FY2026 to FY2027 change

Funding increased by $187.671 million to maintain competitive prototyping.

Before the request year

FY2026: the year under way

Prior-year accomplishments and current-year plans from the same exhibit. Context for the FY2027 plan, not a series — an activity partitions its project exactly in the request year, but can under-cover it in earlier years.

FY2026 plans — current year

- Continue purchasing materials, fabricating components, performing component rig testing, and planning assembly of prototypes to include integration of instrumentation for prototype testing - Conduct Assembly Readiness Reviews assessing each contractor's preparedness to proceed with build and assess test risk of their prototype engine.

Money

Three years, and no five-year plan

An R-2A activity publishes the prior year, the current year and the budget year. The FYDP outyears exist at project and program-element level and are deliberately absent here rather than inferred. Estimate types are colored and never summed into one figure.

1503004500489.7FY25ACTUAL326.0FY26ENACTED513.7FY27REQUEST
Actual Enacted Request
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual489.7
FY2026Enacted326.0
FY2027Request513.7

This activity is 100% of project 640864's FY2027 request and 100% of PE 0604010F's. In the request year the activities under a project sum to it exactly; in the current year they under-cover it in about 9% of cases, so an activity's delta can legitimately exceed its parent's and the two must not be compared row to row.

Where this sits

1 activity in project 640864

Every R-2A line of this project, largest FY2027 request first. Linked where the activity has enough of its own narrative to carry a page; the rest are shown in full on the program-element page.

Next Generational Adaptive Propulsion (NGAP) — this activity$513.7M ▲ 58%
Source
FY2027 Department of the Air Force RDT&E Budget Justification · Exhibit R-2A · PE 0604010F, project 640864 (President's Budget PB2027). Congressional marks are recorded on the program element, never on an activity.