RDT&E Project · President's Budget PB2027

M-SHORAD Inc 4 (Mobility)

FY2027 Request
$108.1M
◆ New start in FY2027
HitchAI read

Project DP7 — M-SHORAD Inc 4 (Mobility) requests $108.1M in FY2027, 23% of the $461.0M requested for program element 0604117A — a new start, with no prior-year and no current-year money. 1 R-2A activity decomposes the request, 1 new this cycle. Development engineering and prototype bu is the largest named R-3 performer at $105.7M, 98% of the project's FY2027 R-3 total.

New start

This project requests $108.1M in FY2027 with no prior-year and no current-year funding. There is no incumbent line to compare it with — it did not exist before this President's Budget.

MarketAir & Missile Defense

Matched on this project's title. A title match, not a curated taxonomy — narrative-only matches are not shown at all rather than shown with a caveat nobody reads. No market size is quoted here: a market spans appropriations far beyond this program element.

FY2027 Request
$108.1M
President's Budget
Project detail

What project DP7 buys

The Maneuver-Short Range Air Defense Increment 4 (M-SHORAD Inc 4) provides Air Defense capability for Joint Forcible Entry (JFE) and Mobile Brigade Combat Team (MBCT) forces. The USG is currently in the Material Solution Analysis phase. A Request for Information (RFI) was issued on 4 March 2026 to evaluate industry's ability and willingness to support the prototype development of a new SHORAD capability. This capability will align with the desired characteristics outlined in the M-SHORAD Inc 4 Abbreviated Capability Development Document (A-CDD).

R-3 lines of work
  • Management Services
  • Product Development
Funding trajectory

Project DP7 funding, FY2027–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

2550751001250108.1FY27REQUEST128.2FY28123.2FY2972.2FY300.9FY31
Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2027Request108.1
FY2028Outyear128.2
FY2029Outyear123.2
FY2030Outyear72.2
FY2031Outyear0.9
Inside the project

1 accomplishment / planned program

The R-2A exhibit — the only level of the budget that describes work that has not happened yet. Activities carry the prior, current and budget year only, no five-year plan. Coverage is partial across the corpus, so count activities, never total them.

M-SHORAD Inc 4 Material Development/IntegrationNEW
FY2025 actual
FY2026 enacted
FY2027 request$108.1M

FY2027 planned work Development, integration and testing of the M-SHORAD Inc 4

FY2026 to FY2027 change Increase of $108.090M is due to program initiation in FY27.

Who's building it

Named performers on project DP7

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

Development engineering and prototype bu
$105.7M · 98%
Program Management
$2.4M · 2.2%