R-2A Activity · President's Budget PB2027

HACM Development

Activity a0·Project 644183 — Hypersonic Attack Cruise Missile (HACM)·PE 0604183F·U.S. Air Force
FY2027 Request
$717.2M
▼ 6.1% vs FY2026
HitchAI read

This activity requests $717.2M in FY2027, 89% of project 644183, down 6.1% on FY2026. The R-2A exhibit describes it across FY2026–FY2027, including what the FY2027 money is planned to buy.

FY2027 Request
$717.2M
▼ 6.1% vs FY2026
FY2026 Enacted
$764.1M
▲ 79% vs FY2025
FY2025 Actual
$426.0M
Prior year
Planned work

What the FY2027 request buys

Verbatim from the R-2A exhibit for project 644183 of PE 0604183F. This is the budget justification's own description of work that has not happened yet — the one thing no other level of the budget carries.

FY2027 planned work

Purchase hardware and validate the HACM design to continue ground and flight test activities. Continue to purchase long-lead flight test asset hardware and make investment in manufacturing readiness and operational suitability improvements.

FY2026 to FY2027 change

The decrease of $46.879 million is due to the program closing critical design activities.

Before the request year

FY2026: the year under way

Prior-year accomplishments and current-year plans from the same exhibit. Context for the FY2027 plan, not a series — an activity partitions its project exactly in the request year, but can under-cover it in earlier years.

FY2026 plans — current year

This effort continued model-based system engineering activities in the Digital Engineering (DE) ecosystem. Continued efforts included additional design verification testing, operational suitability improvements, prototype manufacturing, systems integration, subsystem qualification, manufacturing capacity investment, and integration on the F-15E and F/A-18F platforms. Continued work on product improvement for integration into design, development, and production.

Money

Three years, and no five-year plan

An R-2A activity publishes the prior year, the current year and the budget year. The FYDP outyears exist at project and program-element level and are deliberately absent here rather than inferred. Estimate types are colored and never summed into one figure.

2505007500426.0FY25ACTUAL764.1FY26ENACTED717.2FY27REQUEST
Actual Enacted Request
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual426.0
FY2026Enacted764.1
FY2027Request717.2

This activity is 89% of project 644183's FY2027 request and 89% of PE 0604183F's. In the request year the activities under a project sum to it exactly; in the current year they under-cover it in about 9% of cases, so an activity's delta can legitimately exceed its parent's and the two must not be compared row to row.

Where this sits

2 activities in project 644183

Every R-2A line of this project, largest FY2027 request first. Linked where the activity has enough of its own narrative to carry a page; the rest are shown in full on the program-element page.

HACM Development — this activity$717.2M ▼ 6%
Integration, Qualification, and Test$88.9M ▲ 39%
Source
FY2027 Department of the Air Force RDT&E Budget Justification · Exhibit R-2A · PE 0604183F, project 644183 (President's Budget PB2027). Congressional marks are recorded on the program element, never on an activity.