R-2A Activity · President's Budget PB2027

Pele

Activity a27·Project 250 — Advanced Innovative Technologies·PE 0604250D8Z·Defense-Wide
FY2027 Request
$96.6M
◆ Restart — nothing in FY2026
HitchAI read

This activity requests $96.6M in FY2027, 3.7% of project 250 — a restart, funded in FY2025 and zeroed in FY2026. The R-2A exhibit describes it across FY2025–FY2027, including what the FY2027 money is planned to buy.

Restart

This activity was funded in FY2025 ($83.8M), zeroed in FY2026, and requests $96.6M again in FY2027. A restart has an incumbent and a new start does not; with a zero current year there is no percentage to quote, which is why it appears in no growth ranking.

FY2027 Request
$96.6M
No FY2026 funding
FY2026 Enacted
$0.0M
▼ 100% vs FY2025
FY2025 Actual
$83.8M
Prior year
Planned work

What the FY2027 request buys

Verbatim from the R-2A exhibit for project 250 of PE 0604250D8Z. This is the budget justification's own description of work that has not happened yet — the one thing no other level of the budget carries.

FY2027 planned work

Pele will complete assembly and testing of the individual Reactor, Power Conversion, and Intermediate Heat Exchanger Modules, and deliver all to the Prime contractor facility for integrated Factory Acceptance Testing. At the completion of Factor Acceptance Testing, all elements will be prepared for shipment to INL. Pele will complete all site preparation at INL, to be ready to install modules and hardware upon arrival in early FY 2028

FY2026 to FY2027 change

The decrease supports phasing required for the Pele development cycle with remaining materials and components placed on contract in FY 2026, and final assembly planned for FY 2027.

Before the request year

FY2025–FY2026: what came before

Prior-year accomplishments and current-year plans from the same exhibit. Context for the FY2027 plan, not a series — an activity partitions its project exactly in the request year, but can under-cover it in earlier years.

FY2026 plans — current year

Pele will complete detailed designs and drawings of all reactor and plant systems as well as the site at Idaho National Laboratory, and initiate procurements for all materials and components required to assemble the plant. Pele will complete the Preliminary Safety Analysis Report (PSAR) and submit to the safety authority, Department of Energy, for approval. The Pele core cartridge assembly will be completed and the reactor assembly will begin. Pele will complete development of the Control Module, and continue development of the Power Conversion and Intermediate Heat Exchanger Modules. Pele will complete production of the TRISO fuel compacts and transport the fuel to INL in preparation for reactor fueling in FY 2028. Pele will initiate production of the concrete pad and shield walls for the operational site at INL. The FY 2026 plan includes $41 million of discretionary (Congressional Add) and $209.1 million of mandatory (reconciliation) for a total of $250.100 million.

FY2025 accomplishments

Continue to purchase hardware and begin assembly of the four Pele modules. Fabricate and lay down concrete pad at the test site at Idaho National Labs (INL) while finalizing design of the rest of the concrete structure. Complete fuel for Pele core and ship to Idaho for preparation and storage. The SCO team will continue to work with the NRC in developing a regulatory process for future transport of microreactors. SCO will also support the development of requirements for a potential Service transition.

Money

Three years, and no five-year plan

An R-2A activity publishes the prior year, the current year and the budget year. The FYDP outyears exist at project and program-element level and are deliberately absent here rather than inferred. Estimate types are colored and never summed into one figure.

255075083.8FY25ACTUAL0.0FY26ENACTED96.6FY27REQUEST
Actual Enacted Request
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual83.8
FY2026Enacted0.0
FY2027Request96.6

This activity is 3.7% of project 250's FY2027 request and 3.7% of PE 0604250D8Z's. In the request year the activities under a project sum to it exactly; in the current year they under-cover it in about 9% of cases, so an activity's delta can legitimately exceed its parent's and the two must not be compared row to row.

Where this sits

34 activities in project 250

Every R-2A line of this project, largest FY2027 request first. Linked where the activity has enough of its own narrative to carry a page; the rest are shown in full on the program-element page.

Classified Projects$1,108.9M ▲ 370%
Foundation$173.4M NEW
Bellaire$168.6M NEW
Pernicious$168.6M NEW
Advanced Innovative Technologies Project Management$146.6M ▲ 107%
Pele — this activity$96.6M RESTART
Asgard$76.8M ▲ 42%
Equinox$76.6M ▲ 137%
Attila$72.3M NEW
Epic$63.3M ▼ 32%
Base Camp$62.0M NEW
Lazarus$52.5M ▲ 185%
Hurt Locker$50.0M ▲ 204%
Oculus Prime$41.2M ▲ 51%
Black Marlin$39.1M NEW
Rolling Dice$33.2M ▲ 36%
Heimdall$27.2M NEW
Mission Support Infrastructure$27.1M ▲ 11%
Cottontail$24.1M NEW
Portunus$20.0M ▲ 900%
Providence$19.0M flat
BIAO$15.4M NEW
Endeavour$13.9M NEW
Emerging Opportunities$13.5M ▲ 11%
Legend$10.0M NEW
Valjean$9.9M NEW
Bedlam$6.5M ▲ 8%
Gollum$5.5M ▼ 76%
DEEJ$4.4M NEW
Galaxian
Hailstone▼ 100%
Hypervelocity Gun Weapon System (HGWS)
Kenobi▼ 100%
Seamans Eye
Source
FY2027 Office of the Secretary of Defense RDT&E Budget Justification · Exhibit R-2A · PE 0604250D8Z, project 250 (President's Budget PB2027). Congressional marks are recorded on the program element, never on an activity.
Machine access
Markdown twin /programs/0604250D8Z/250/a27.md · MCP mcp.hitchintel.combudget_get_activity