R-2A Activity · President's Budget PB2027

EA-18G Growler Block II

Activity a3·Project 3063 — EA-18G Development·PE 0604269N·U.S. Navy
FY2027 Request
$126.0M
▼ 26% vs FY2026
HitchAI read

This activity requests $126.0M in FY2027, 96% of project 3063, down 26% on FY2026. The R-2A exhibit describes it across FY2026–FY2027, including what the FY2027 money is planned to buy.

FY2027 Request
$126.0M
▼ 26% vs FY2026
FY2026 Enacted
$170.5M
▲ 57% vs FY2025
FY2025 Actual
$108.3M
Prior year
Planned work

What the FY2027 request buys

Verbatim from the R-2A exhibit for project 3063 of PE 0604269N. This is the budget justification's own description of work that has not happened yet — the one thing no other level of the budget carries.

FY2027 planned work

Developmental testing and integration of Growler Block II (GB2) Phase 1 in both laboratory and flight environments moves to start of iterative capability improvement. Operational testing of Growler Block 2 Phase 1 completes. Continue GB2 Phase 2 EMD phase activities to include purchase of test asset material, integration and developmental testing of the Beowulf iLEF, MFA, and a Sensor Control Unit (SCU) in preparation for GB2 Phase 2 CDR.

FY2026 to FY2027 change

FY2026 to FY2027 decrease of ($44.443M) due to ramp-down and completion of Next Generation Electronic Attack Unit (NGEAU) Non-Recurring Engineering (NRE) efforts as the program moves into the production phase.

Before the request year

FY2026: the year under way

Prior-year accomplishments and current-year plans from the same exhibit. Context for the FY2027 plan, not a series — an activity partitions its project exactly in the request year, but can under-cover it in earlier years.

FY2026 plans — current year

Continue developmental testing and integration of Growler Block II (GB2) Phase 1 in both laboratory and flight environments. Low Rate Initial Production (LRIP) units commence deliveries to squadrons ahead of modification of aircraft and fielding. Continue GB2 Phase 2 EMD phase activities to include integration and developmental testing of the Beowulf iLEF, MFA, and a Sensor Control Unit (SCU) in preparation for GB2 Phase 2 OTRR.

Money

Three years, and no five-year plan

An R-2A activity publishes the prior year, the current year and the budget year. The FYDP outyears exist at project and program-element level and are deliberately absent here rather than inferred. Estimate types are colored and never summed into one figure.

501001500108.3FY25ACTUAL170.5FY26ENACTED126.0FY27REQUEST
Actual Enacted Request
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual108.3
FY2026Enacted170.5
FY2027Request126.0

This activity is 96% of project 3063's FY2027 request and 96% of PE 0604269N's. In the request year the activities under a project sum to it exactly; in the current year they under-cover it in about 9% of cases, so an activity's delta can legitimately exceed its parent's and the two must not be compared row to row.

Where this sits

4 activities in project 3063

Every R-2A line of this project, largest FY2027 request first. Linked where the activity has enough of its own narrative to carry a page; the rest are shown in full on the program-element page.

EA-18G Growler Block II — this activity$126.0M ▼ 26%
EA-18G Flight Plan Engineering$5.6M ▼ 61%
EA-18G AEA System Enhancements (ASE) and Integrated Capability Package (ICP-3)$0.0M
EA-18G System Configuration Set (SCS) Development & Integration$0.0M
Source
FY2027 Department of the Navy RDT&E Budget Justification · Exhibit R-2A · PE 0604269N, project 3063 (President's Budget PB2027). Congressional marks are recorded on the program element, never on an activity.
Machine access
Markdown twin /programs/0604269N/3063/a3.md · MCP mcp.hitchintel.combudget_get_activity