What project 3327 buys
This project unit supports the United States Marine Corps (USMC) development of Marine Air Ground Task Force (MAGTF) Electronic Warfare (EW) and the various elements of its distributed System of Systems (SoS). The SoS addresses MAGTF EW sufficiency gaps in the areas of Electronic Attack (EA) and Electronic Warfare Support (ES) with a multitude of payloads designed for carriage on a variety of organic MAGTF air assets. Payload development plans follow an adaptable, modular and open architecture philosophy to combat the increasing capability gap and enable future growth at a reduced operational and sustainment cost. A key element to this capability is the AN/ALQ-231(V) Intrepid Tiger II program. The AN/ALQ-231(V)1 pod is the variant of the Intrepid Tiger II pod flown on the AV-8B, F/A-18A-D, and KC-130J platforms. The AN/ALQ-231(V)3 is the variant of the Intrepid Tiger II pod flown on the UH-1Y platform, with plans for integration on AH-1Z platforms. (V)3 Blk 2 is an Engineering Change Proposal (ECP) to the original (V)3, providing additional capability to address evolving threats. Plans include future integration of AN/ALQ-231(V) Block X advanced capability and counter-radar upgrades on USMC tilt rotor, fixed wing, rotary wing and unmanned aircraft. The AN/ALQ-231(V)4 is the first implementation of Block X upgrades on MV-22B aircraft and future (V)5 BLK X integration may occur on platforms such as, but not limited to, the KC-130J, MQ-9, CH-53K, and AH-1Z platforms. All payload variants are capable of conducting, supporting, and coordinating Electro-Magnetic Spectrum (EMS) operations in the form of EA and ES against Irregular Warfare threats. Additionally, all payloads are scalable and adaptable for emerging threats and are interoperable with the USMC's Electronic Warfare Services Architecture (EWSA). The Intrepid Tiger II capability is designed to be integrated for MAGTF tactical coordination of cyberspace and EW operations via the Cyber Electronic Warfare Coordination Cell (CEWCC).
- Product Development
- Support
- Test and Evaluation
- Management Services
Project 3327 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 14.9 |
| FY2026 | Enacted | 13.6 |
| FY2027 | Request | 13.2 |
| FY2028 | Outyear | 15.2 |
| FY2029 | Outyear | 15.3 |
| FY2030 | Outyear | 15.5 |
| FY2031 | Outyear | 15.8 |
1 accomplishment / planned program
The R-2A exhibit — the only level of the budget that describes work that has not happened yet. Activities carry the prior, current and budget year only, no five-year plan. Each describes FY2027 work in enough detail to have its own page; the rest are shown here in full. Coverage is partial across the corpus, so count activities, never total them.
FY 2027 efforts will continue (V)4 development with incorporation of radio variants compatible with other USMC systems and requirements, continuation of the (V)3 blk 2 ECP and begin integration efforts of (V)3 blk 2 on the AH-1Z aircraft. Development of capabilities and jamming techniques in support of evolving Intrepid Tiger II target…
Read the FY2027 plan →Named performers on project 3327
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.