R-2A Activity · President's Budget PB2027

USMC Vertical Take-Off and Landing (VTOL) Development

FY2027 Request
$42.2M
▲ 25% vs FY2026
HitchAI read

This activity requests $42.2M in FY2027, 100% of project 3751, up 25% on FY2026. The R-2A exhibit describes it across FY2026–FY2027, including what the FY2027 money is planned to buy.

FY2027 Request
$42.2M
▲ 25% vs FY2026
FY2026 Enacted
$33.9M
▼ 31% vs FY2025
FY2025 Actual
$49.2M
Prior year
Planned work

What the FY2027 request buys

Verbatim from the R-2A exhibit for project 3751 of PE 0604295M. This is the budget justification's own description of work that has not happened yet — the one thing no other level of the budget carries.

FY2027 planned work

Continued vendor Mission Systems Integration and development of identified software/hardware autonomy solutions into demonstration aircraft. Air Test and Evaluation Squadron Two Four (UX-24) will continue to conduct prototype evaluations of vendor autonomy suites while MAWTS-1 and Marine Operational Test and Evaluation Squadron One (VMX-1) will follow with operational assessments of those suites. Anticipated operational assessment will occur OCONUS/CONUS in support of a limited Contractor Owned-Contractor Operated (COCO) deployment of assets with Marine Littoral Regiment (MLR). The operational assessment will refine aspects of Fleet integration and identify risk areas associated with DOTmLPF. Due to expeditionary nature of Aerial Logistics Connector (ALC), static cargo demonstrators will further inform DOTmLPF towards reducing manpower and training requirements associated with expeditionary operations. Future Attack/Strike (FASt) CDTM efforts will focus on fully informed mission effectiveness and operational analysis to demonstrate platform integration with MAGTF and Aviation Combat Element integrated kill web execution. Tasks include: acquisition program management functions, systems engineering activities, Integration Laboratory engineering modeling and analysis, Master Test Strategy (MTS) execution, and system specification development. The Integration Laboratory will use IT infrastructure that supports real-time, collaborative Government/vendor interaction at multiple security levels, supporting bench level testing of software/hardware, and will be used to conduct defect testing and anomaly exploration discovered during prototype evaluations.

FY2026 to FY2027 change

Funds increase from FY 2026 to FY 2027 to support ALC Mission Systems Integration (i.e., autonomy, navigation and user interface integration) and support for MLR operational assessment.

Before the request year

FY2026: the year under way

Prior-year accomplishments and current-year plans from the same exhibit. Context for the FY2027 plan, not a series — an activity partitions its project exactly in the request year, but can under-cover it in earlier years.

FY2026 plans — current year

Vendors will develop and integrate unique software/hardware autonomy solutions into demonstration aircraft. Air Test and Evaluation Squadron Two Four (UX-24) will conduct prototype evaluations of vendor autonomy suites while MAWTS-1 and Marine Operational Test and Evaluation Squadron One (VMX-1) will follow with operational assessments of those suites. These operational assessments will refine aspects of Fleet integration and identify risk areas associated with Doctrine, Organization, Training, Material, Leadership and Education, Personnel, and Facilities (DOTmLPF). Due to expeditionary nature of ALC, static cargo demonstrators will further inform DOTmLPF towards reducing manpower and training requirements associated with expeditionary operations. Preliminary Design Review (PDR) and Critical Design Review (CDR) events will occur in FY 2026. Future Attack/Strike CDTM efforts will focus on trade studies and design reviews associated with marinization and shipboard compatibility. Tasks include: acquisition program management functions, systems engineering activities, Integration Laboratory engineering modeling and analysis, Master Test Strategy (MTS) execution, and system specification development. The Integration Laboratory will use IT infrastructure that supports real-time, collaborative government/vendor interaction at multiple security levels, supports bench level testing of software/hardware, and conduct defect testing and anomaly exploration discovered during prototype evaluations.

Money

Three years, and no five-year plan

An R-2A activity publishes the prior year, the current year and the budget year. The FYDP outyears exist at project and program-element level and are deliberately absent here rather than inferred. Estimate types are colored and never summed into one figure.

2550049.2FY25ACTUAL33.9FY26ENACTED42.2FY27REQUEST
Actual Enacted Request
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual49.2
FY2026Enacted33.9
FY2027Request42.2

This activity is 100% of project 3751's FY2027 request and 90% of PE 0604295M's. In the request year the activities under a project sum to it exactly; in the current year they under-cover it in about 9% of cases, so an activity's delta can legitimately exceed its parent's and the two must not be compared row to row.

Where this sits

1 activity in project 3751

Every R-2A line of this project, largest FY2027 request first. Linked where the activity has enough of its own narrative to carry a page; the rest are shown in full on the project page.

USMC Vertical Take-Off and Landing (VTOL) Development — this activity$42.2M ▲ 25%
Source
FY2027 Department of the Navy RDT&E Budget Justification · Exhibit R-2A · PE 0604295M, project 3751 (President's Budget PB2027). Congressional marks are recorded on the program element, never on an activity.