RDT&E Project · President's Budget PB2027

Integrated Combat System (ICS),

FY2027 Request
$41.5M
▼ 59% vs FY2026
HitchAI read

Project 1111 — Integrated Combat System (ICS), requests $41.5M in FY2027, 9.8% of the $425.1M requested for program element 0604307N, down 59% on FY2026. 2 R-2A activities decompose the request. Lockheed Martin is the largest named R-3 performer at $10.5M, 25% of the project's FY2027 R-3 total.

FY2027 Request
$41.5M
▼ 59% vs FY2026
FY2026 Enacted
$102.0M
▲ 23% vs FY2025
FY2025 Actual
$83.0M
Prior year
Project detail

What project 1111 buys

MK 6 MOD X Computing Infrastructure (CI) delivers the developmental efforts and prototypes to enable future delivery of Infrastructure as a Service (IaaS) in support of all surface combatants (e.g. DDG, DDG(X), CVN, LPD, LHD, and LHA). IaaS provides hatch able hardware abstracted from software, enabling upgrade outside modernization periods (agility) to more ships (capacity). The MK 6 MOD X CI is a foundational element of the surface Navy's Integrated Combat System (ICS) System supporting all future ship classes. Top Level Requirements (TLR) were validated in the Initial Capabilities Document for the Future Surface Combatant Force. Software Factory (SW Factory) provides a Continuous Integration/Continuous Delivery (CI/CD) pipeline for software where combat system applications are developed, tested, certified, and fielded to the Fleet at speed. The AEGIS and Ship Self Defense System (SSDS) computer programs will be re-factored into a single ICS computer program. Provides rapid combat system development, test, certification, and authorization; more frequent delivery, and faster turnaround of Fleet feedback into working software and fielding to the IaaS-enabled fleet.

R-3 lines of work
  • Product Development
  • Test and Evaluation
  • Management Services
Funding trajectory

Project 1111 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

255075100083.0FY25ACTUAL102.0FY26ENACTED41.5FY27REQUEST34.8FY2834.0FY2933.1FY3033.7FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual83.0
FY2026Enacted102.0
FY2027Request41.5
FY2028Outyear34.8
FY2029Outyear34.0
FY2030Outyear33.1
FY2031Outyear33.7
Inside the project

2 accomplishments / planned programs

The R-2A exhibit — the only level of the budget that describes work that has not happened yet. Activities carry the prior, current and budget year only, no five-year plan. Each describe FY2027 work in enough detail to have their own page; the rest are shown here in full. Coverage is partial across the corpus, so count activities, never total them.

FY2025 actual$25.2M
FY2026 enacted$23.7M
FY2027 request$24.7M

Computing Infrastructure Deliveries for AEGIS (FY27) and SSDS (FY27) Continue to support Force Level Future Naval Capabilities (FNCs) Continued Platforms GFI Deliveries in support of various AEGIS and SSDS Ships Continue MK 6 MOD X IPRs / PI Demos Continue to improve IaaS ORDALT Kits Continue to improve IaaS design and further software…

Read the FY2027 plan →
FY2025 actual$57.9M
FY2026 enacted$78.3M
FY2027 request$16.7M

ICS SOFTWARE RELEASE Q4/FY27 PROGRAM INCREMENT DEMO Q4/FY26 SW Factory to rearchitect and factor AEGIS and Ship Self Defense System (SSDS) legacy computer programs existing capabilities into a single code base fielded as part of the Integrated Combat System (ICS) configuration. Refactor heritage code base into containerized microservices…

Read the FY2027 plan →
Who's building it

Named performers on project 1111

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

Lockheed Martin
$10.5M · 25%
Booz Allen
$5.7M · 14%
SOLUTE
$5.4M · 13%
Northrop Grumman
$4.5M · 11%