# Project 1447 — Surf Combatant Combat System Imp

**Program element:** 0604307N — Surface Combatant Cmbt Sys Eng  
**Project:** 1447  
**Component:** U.S. Navy  
**Appropriation:** 1319 — RDT&E, Navy  
**Budget Activity:** 5 — System Development & Demonstration  
**Vintage:** President's Budget PB2027  
**Canonical URL:** https://hitchintel.com/programs/0604307N/1447  
**Parent:** https://hitchintel.com/programs/0604307N

## Summary

Project 1447 — Surf Combatant Combat System Imp requests $377.3M in FY2027, 89% of the $425.1M requested for program element 0604307N, up 17% on FY2026. 10 R-2A activities decompose the request, 1 new this cycle. Lockheed Martin is the largest named R-3 performer at $247.8M, 66% of the project's FY2027 R-3 total.

## Funding profile

| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 419.3 |
| FY2026 | Enacted | 322.0 |
| FY2027 | Request | 377.3 |
| FY2028 | Outyear | 377.0 |
| FY2029 | Outyear | 351.8 |
| FY2030 | Outyear | 275.9 |
| FY2031 | Outyear | 278.2 |

> Estimate types are not summed. This project is one leaf of PE 0604307N; the PE total is the sum of its projects, never added to them.

## What project 1447 buys

AEGIS Development Support is the foundation that maintains the Research and Development Land Based Test Facilities, Technical Design Agent (TDA), Commercial Off The Shelf (COTS) hardware engineering, and Program Management services required to support the development and integration efforts required to effectively design, test and certify, Combat System computer programs. Starting in FY26, this line includes the Combat System Test Bed (CSTB) efforts, which support model development designed to reduce testing requirements. AEGIS BL 9.2.2 delivered in FY21 to TI-12 hardware ships, integrated previous CSL capabilities plus Surface Electronic Warfare Improvement Program (SEWIP) BLK 2 integration (auto association); MH-60R integration; Advanced Training Doman; Boundary Defense Capability; Integrated Air and Missile Defense (IAMD) mission planner; Above Water Sensor Coordinator; Agile Moondog, Sirocco, Sundog part 1, Silent Squall part 1, and Vortex; Advanced Calibration Experiment; Cyber enhancements (cyber resource services, boundary proxy service, Security Information and Event Management (SIEM), network device integrity, update manager); and BMD 5.1.3.1 (MDA-developed). BL 9.2.2 delivered the previously listed capabilities plus warfighting improvements derived from operations in the Red Sea to remaining TI-12H ships in FY24. BL 9.2.2 will deliver previously listed capabilities with further threat-based modernization improvements derived from Red Sea operations to TI-12H ships in FY25. (Effort Completes in FY25) AEGIS Capability Package (CP) 2022, delivered in FY23, builds upon previous CSL capabilities, integrating Multi Mission Signal Processor (MMSP)-Restoration (AMOD DDG only); AEGIS Linear Processing System (ALPS); High-Energy Laser with Integrated Optical-Dazzler and Surveillance (HELIOS); SM-2 Blk IIIC initial capability; Agile Firestorm; Mk 38 Mod 4 Engineering Operational Sequencing System (EOSS) integration; and BMD 5.1.4 (MDA-developed) capabilities. CP 2022-2 delivered to DDG 91 to support its modernization test program in FY24. Dependent on SEWIP BLK 3 Integration effort. CP 2022-2 was delivered to DDG 91 to support its modernization test program in FY24. Dependent on SEWIP BLK 3 Integration effort.

**R-3 lines of work:** Product Development; Test and Evaluation; Management Services.

## Named R-3 performers

| Performer | $M | Share of this project's FY2027 R-3 total |
|---|---|---|
| Lockheed Martin | 247.8 | 66% |
| NRL | 11.3 | 3.0% |
| NAWC | 9.3 | 2.5% |
| BAE Systems | 6.8 | 1.8% |

> Budget-justification contract funding, not obligations. Shares need not reach 100% — unnamed and government work is in the denominator.

## Activities (R-2A) — 10

| Activity | FY2025 | FY2026 | FY2027 | Move | Page |
|---|---|---|---|---|---|
| PAC 3 - MSE Navy | 0.0 | 0.0 | 120.6 | new | [a9](https://hitchintel.com/programs/0604307N/1447/a9) |
| BL 10 AEGIS FLT IIA & III DESTROYER CONTINUOUS WARFIGHTER IMPROVEMENTS | 173.2 | 158.1 | 112.5 | −29% | [a3](https://hitchintel.com/programs/0604307N/1447/a3) |
| BL 9 DESTROYER CONTINUOUS WARFIGHTING IMPROVEMENTS | 35.2 | 82.7 | 91.4 | +10% | [a2](https://hitchintel.com/programs/0604307N/1447/a2) |
| AEGIS DEVELOPMENT SUPPORT | 67.7 | 76.4 | 48.9 | −36% | [a0](https://hitchintel.com/programs/0604307N/1447/a0) |
| BL 5/7 DESTROYER UPGRADES | 24.1 | 4.8 | 3.9 | −19% | — |
| AEGIS CAPABILITY PACKAGE 2024 | 40.0 | 0.0 | 0.0 | — | — |
| COMBAT SYSTEMS TEST BED (CSTB) | 23.5 | 0.0 | 0.0 | — | — |
| TASK FORCE CYBER AWAKENING (TFCA) | 32.3 | 0.0 | 0.0 | — | — |
| COLLABORATIVE IAMD PLANNING PROGRAM (CIPP) | 3.3 | 0.0 | 0.0 | — | — |
| AEGIS DEVELOPMENTAL TESTING / OPERATIONAL TESTING (DT/OT) | 20.0 | 0.0 | 0.0 | — | — |

> Activities carry the prior, current and budget year only — no five-year plan. In the request year they partition this project exactly; in earlier years they can under-cover it.

### PAC 3 - MSE Navy — NEW START

COMBAT SYSTEM INTEGRATION: Conduct System Engineering, software engineering, and program management tasks to include develop and review specifications, interface definition, code development, component level testing, element verification, and early system level integration. Provide system engineering efforts required to support the…

Full year-by-year narrative: https://hitchintel.com/programs/0604307N/1447/a9

### BL 10 AEGIS FLT IIA & III DESTROYER CONTINUOUS WARFIGHTER IMPROVEMENTS

Support Combat System Ship Qualification Trials aboard DDG 128 in Q1 FY26. Continue to support the incremental design, development and integration of AEGIS BL 10.0.1, completing the Baseline Phase 4 Combat System Shipboard Testing, Final Certification and fielding for BL 10.0.1. Continue executing integration events, maintainability…

Full year-by-year narrative: https://hitchintel.com/programs/0604307N/1447/a3

### BL 9 DESTROYER CONTINUOUS WARFIGHTING IMPROVEMENTS

Develop, test, certify, and deliver two iterations of BL 9.C3, to include capabilities identified by resource sponsor in the areas of Integrated Air and Missile Defense (IAMD), Anti-Air Warfare (AAW), Anti-Surface Warfare (ASuW), Anti-Submarine Warfare (ASW), and other priority warfare areas. Conduct pre and post certification test…

Full year-by-year narrative: https://hitchintel.com/programs/0604307N/1447/a2

### AEGIS DEVELOPMENT SUPPORT

AEGIS System Engineering: Continue to provide AEGIS System Engineering evaluation of AEGIS Combat System performance and development of the AEGIS Capability Phasing Plan to ensure that warfighter improvements are implemented through future Combat System upgrades to meet emerging threats. These efforts are focused on defining future…

Full year-by-year narrative: https://hitchintel.com/programs/0604307N/1447/a0

### BL 5/7 DESTROYER UPGRADES

**FY2027 planned work.** Evaluate AEGIS BL 5 and 7 performance and identify critical updates required to maintain competitive warfighting edge and relevance against evolving threats. Complete development, integration and testing to address discrepancies within AEGIS BL 5 and BL 7 DDG configurations.

**FY2026 to FY2027 change.** FY26 to FY27 decrease is due to BL 5 projection of less defects with the fielding of Threat Based modernization build completed in FY26.

**FY2026 plans — current year.** Complete underway testing assessment post combat systems certification. Identify critical issues impacting the operations performance of the ships that receive BL 5.4.1 and develop work packages to complete software updates as required. Incorporate additional defect corrections from any on-going Red Sea or other operations. Evaluate AEGIS BL 5 and 7 performance and identify critical updates required to maintain competitive warfighting edge and relevance against evolving threats. Complete development, integration and testing to address discrepancies within AEGIS BL 5 and BL 7 DDG configurations.

### COMBAT SYSTEMS TEST BED (CSTB)

**FY2026 plans — current year.** Effort Shifts to Aegis Development Support - Included as part of FY26 plans

### TASK FORCE CYBER AWAKENING (TFCA)

**FY2026 plans — current year.** Effort Shifts to BL 9 and BL 10 Destroyer Warfighter Improvements - Included as part of FY26 plans

### COLLABORATIVE IAMD PLANNING PROGRAM (CIPP)

**FY2026 plans — current year.** Effort Shifts to BL 9 Destroyer Warfighter Improvements - Included as part of FY26 plans

### AEGIS DEVELOPMENTAL TESTING / OPERATIONAL TESTING (DT/OT)

**FY2026 plans — current year.** Effort Shifts to BL 10 Destroyer Warfighter Improvements - Included as part of FY26 plans

## What is NOT on this page

Congressional marks, the R-2 mission description and acquisition strategy, the industry vs government split of the whole request, and related program elements are recorded at **program-element** grain — an NDAA mark lands on a PE, never on a project. They are at https://hitchintel.com/programs/0604307N.

## Source & machine access

- **Source:** FY2027 Department of the Navy RDT&E Budget Justification, Exhibits R-2/R-2A/R-3, PE 0604307N project 1447 (PB PB2027).
- **MCP:** `mcp.hitchintel.com` — `budget_get_program_element(pe="0604307N")`.

*HitchAI is an independent intelligence service, not affiliated with the U.S. Department of Defense. Budget figures are requests/estimates, not obligations.*