# Integration and Test (I&T) Integrated Product Team (IPT)

**R-2A activity** of project 3159 — Naval Integrated Fire Control-Counter Air SE&I  
**Program element:** 0604378N — Nav Integrated Fire Control - Counter Air Sys E  
**Component:** U.S. Navy · **Budget Activity:** 5  
**Vintage:** President's Budget PB2027  
**Canonical URL:** https://hitchintel.com/programs/0604378N/3159/a0  
**Parent:** https://hitchintel.com/programs/0604378N/3159

## Summary

This activity requests $17.2M in FY2027, 57% of project 3159, up 58% on FY2026. The R-2A exhibit describes it across FY2026–FY2027, including what the FY2027 money is planned to buy.

## What the FY2027 request buys

**FY2027 planned work.** As the NAVY lead for CSSN Project the NIFC team will execute Joint TrackExs and two Live Fire Events in FY27 in conjunction with ARMY and MDA. Test events to occur at White Sands Missile Range (WSMR) late FY27.

**FY2026 to FY2027 change.** The Integration and Test IPT increased from $10.906 to $17.218 The $6.312M increase from FY26 to FY27 is for a Joint TrackEx and two live fire test events scheduled in FY27 at White Sands Missile Range for the CSSN Project. This is an OSW sponsored project with MDA, Army and Navy participation with the Navy / NIFC Team performing as the lead service.

## Before the request year

**FY2026 plans — current year.** Execute Test Events in FY26: Capability Demonstration (CD) TrackEx (Non-Fire) as part of Combat Systems Ship Qualification Trials (CSSQT). Test planning and test integration events (Pillar and Pair/Tri wise testing in accordance with the NIFC System Engineering Plan (SEP), for Naval Integrated Fire Control - Advanced Waveform (NIFC-AW) Live Fire event in coordination with USMC to be conducted in FY27 (Currently not funded). Test planning and integration events, working group coordination for Land Based Live Fire in cooperation with the Army for Joint TrackEx and live fire events in FY27 (Cross Service Sensor Netting (CSSN) project).

## Funding

| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 12.8 |
| FY2026 | Enacted | 10.9 |
| FY2027 | Request | 17.2 |

> Prior, current and budget year only — an R-2A activity carries no five-year plan. It sums exactly into its project in the request year and not necessarily in any other.

## Other activities in project 3159

- [Engineering Management And System Definition](https://hitchintel.com/programs/0604378N/3159/a1) — FY2027 12.9

## Source & machine access

- **Source:** FY2027 Department of the Navy RDT&E Budget Justification, Exhibit R-2A, PE 0604378N project 3159 (PB PB2027). Narrative is the government's own text.
- **No marks, no contractors at this grain** — congressional marks land on the program element and R-3 performers on the project.
- **MCP:** `mcp.hitchintel.com` — `budget_get_activity`.

*HitchAI is an independent intelligence service, not affiliated with the U.S. Department of Defense. Budget figures are requests/estimates, not obligations.*