RDT&E Project · President's Budget PB2027

Mitigate (SDD)

FY2027 Request
$44.0M
▼ 2.0% vs FY2026
HitchAI read

Project MT5 — Mitigate (SDD) requests $44.0M in FY2027, 17% of the $261.9M requested for program element 0604384BP, down 2.0% on FY2026. 8 R-2A activities decompose the request, 1 new this cycle.

FY2027 Request
$44.0M
▼ 2.0% vs FY2026
FY2026 Enacted
$44.9M
▼ 23% vs FY2025
FY2025 Actual
$58.3M
Prior year
Project detail

What project MT5 buys

The Mitigate System Development & Demonstration (SDD) Project provides the Joint Force the ability to recover from exposure to chemical and biological hazards and quickly return to the fight. Efforts include development of U.S. Food & Drug Administration (FDA) approved medical countermeasures (MCMs) to protect the lives and maintain the battle readiness of the warfighter. Efforts also provide safe, effective MCMs to enable warfighter recovery and return to duty after exposure to chemical threat agents, and reduce logistics needs of decontamination methods with operationally-relevant test methods and allows personnel to reduce Mission-Oriented Protective Posture (MOPP) levels as rapidly as possible. Activities in this project realize considerable efficiencies through cost sharing agreements. Efforts included in this Project are: (1) Alternative Autoinjector Manufacturer Capability (AUTOINJ) - RAD-A (2) Anti-Viral Oral Therapeutics (AVO TX) - Non-Clinical Studies (3) Countering Emerging Threats Rapid Acquisition and Investigation of Drugs for Repurposing (CET RAIDR) (4) CET RAIDR - Enhanced Biological Defense (CET RAIDR-ENBD) (5) Forward Area Mobility Spray System (FAMS-S) - Aircraft Interior Decon (AID) (6) Service Equipment Decontamination System (SEDS) (7) Tactical Contamination Mitigation System (TCMS) (8) Improved Nerve Agent Treatment System Centrally Acting (INATS CA) - Non-Clinical

R-3 lines of work
  • Product Development
  • Support
  • Test and Evaluation
  • Management Services
Funding trajectory

Project MT5 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

2550058.3FY25ACTUAL44.9FY26ENACTED44.0FY27REQUEST55.3FY2853.1FY2946.0FY3040.7FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual58.3
FY2026Enacted44.9
FY2027Request44.0
FY2028Outyear55.3
FY2029Outyear53.1
FY2030Outyear46.0
FY2031Outyear40.7
Inside the project

8 accomplishments / planned programs

The R-2A exhibit — the only level of the budget that describes work that has not happened yet. Activities carry the prior, current and budget year only, no five-year plan. 1 of them describes FY2027 work in enough detail to have its own page; the rest are shown here in full. Coverage is partial across the corpus, so count activities, never total them.

FY2025 actual$15.4M
FY2026 enacted$15.7M
FY2027 request$16.5M

Field multiple data updates to military medical guidelines to support medical rapid response and maintain force regeneration in a chemical or biological emergency. Continue evaluating FDA-approved and/or late-stage products to repurpose as a CB defense MCM.

Read the FY2027 plan →
2) Anti-Viral Oral Therapeutics (AVO TX) - Non-Clinical Studies▲ 225%
FY2025 actual
FY2026 enacted$3.8M
FY2027 request$12.5M

FY2027 planned work Continue dose ranging studies in preparation for Good Laboratory Practice (GLP) regulated pivotal efficacy studies

FY2026 to FY2027 change Increase due to expanding studies into second safety/efficacy model.

FY2026 plans — current year Initiate non-clinical efficacy and dose ranging studies, with procurement of long lead items.

4) Countering Emerging Threats Rapid Acquisition and Investigation of Drugs for Repurposing - Enhanced Biological Defense (CET RAIDR-ENBD)▲ 2%
FY2025 actual$7.3M
FY2026 enacted$7.3M
FY2027 request$7.5M

FY2027 planned work Field multiple data updates to military medical guidelines to support medical rapid response and maintain force regeneration in a chemical or biological emergency. Continue nonclinical studies to evaluate FDA-approved and/or late-state products to repurpose to treat symptoms from CB threats.

FY2026 to FY2027 change Minor change due to routine program adjustments.

FY2026 plans — current year Continue nonclinical studies to evaluate FDA-approved and/or late-state products to repurpose as therapeutic interventions.

FY2025 accomplishments Fielded multiple military medical guidelines to support medical rapid response and maintain force regeneration in a chemical or biological emergency. Continued nonclinical studies to evaluate FDA-approved and/or late-stage products to repurpose to treat symptoms from CB threats.

7) Tactical Contamination Mitigation System (TCMS)▼ 22%
FY2025 actual
FY2026 enacted$6.5M
FY2027 request$5.1M

FY2027 planned work Award the Phase 3 Prototype Contract for the spray systems that will be utilized during EMD. Initiate and complete Critical Design Review, Manufacturing Readiness Assessment, and Systems Verification Review (SRR) / Production Readiness Review (PRR). Initiate and complete DT/OT, including Iterative Warfighter Touchpoints, Reliability & Maintainability, Packaging, Handling, Storage, and Transportation (PHS&T) testing.

FY2026 to FY2027 change Decrease due to FY 2027 Milestone B Engineering and Manufacturing Development (EMD) activities ramping down as the program prepares for Milestone C Limited Rate Initial Production (LRIP) in FY 2028.

FY2026 plans — current year Milestone B planned 3Q FY 2026. Initiate and complete Manufacturing Readiness Assessment. Prepare contracting documentation for applicator contract(s) in support of DT/OT. Planning for Development Testing/Operational Testing (DT/OT).

5) Forward Area Mobility Spray System (FAMS-S) - Aircraft Interior Decon (AID)NEW
FY2025 actual
FY2026 enacted
FY2027 request$2.5M

FY2027 planned work FAMS-S AID is forecasted to enter the Engineering and Manufacturing Development (EMD) Phase at Milestone B as a new variant to the FAMS-S Major Capability Acquisition (MCA) ACAT IV program. Award a competitive request for prototype contracting action and select a candidate technology to mature through the program's lifecycle. Complete a Preliminary Design Review (PDR) to confirm the maturity and technical adequacy of the design and its ability to meet the Capability Development Document (CDD) requirements.

FY2026 to FY2027 change Program/project transitioned to Engineering and Manufacturing Development Phase. FAMS-S consists of three variants; the man-portable, the small scale and large scale vehicle-mounted variants. This exhibit adds a fourth variant to the program, Aircraft Interior Decontamination (AID). The AID variant will enable Special Operations Forces to rapidly decontaminate the sensitive irreplaceable electronics on the interior of aircraft, helicopters, boats, vehicles, or support equipment.

1) Alternative Autoinjector Manufacturer Capability (AUTOINJ) - RAD-A▼ 100%
FY2025 actual$15.6M
FY2026 enacted$5.8M
FY2027 request

FY2026 to FY2027 change Program/project is entering completion and all activities will be closed. Decrease due to completion of program activities in FY 2026.

FY2026 plans — current year Continuation of device development and engineering work. Support pre-IND FDA meeting responses. Develop clinical and non-clinical study test protocols. Execute atropine drug stability testing. Continuation of drug formulation work.

FY2025 accomplishments Continued device development of atropine autoinjector. Completed formative human factors study for the atropine autoinjector. Selected formulation method with additional formulation activities ongoing. Initiated Technology Transfer activities and continued batch production of atropine. Delivered devices for military feasibility and military usability studies.

6) Service Equipment Decontamination System (SEDS)▼ 100%
FY2025 actual$11.9M
FY2026 enacted$5.7M
FY2027 request

FY2026 to FY2027 change Program/project terminated in FY 2027. Decrease due to termination of the Joint SEDS effort.

FY2026 plans — current year Joint Service Service Equipment Decontamination System (SEDS) will complete Engineering and Manufacturing Development (EMD) phase activities, to include conducting testing being leveraged by Special Operations Forces (SOF) Critical Equipment Decontamination (CEDS), take delivery of updated Technical Data Package, complete Physical Configuration Audit, and archive data. Program is preparing for orderly shutdown due to termination of effort. SOF CEDS will complete prototype development and retesting.

FY2025 accomplishments Joint Service SEDS continued EMD phase activities to include Laboratory Method Development, Chemical Efficacy contact and vapor testing, Decontamination Enclosure testing, Decontaminant Interoperability, Decontaminant Shelf Life, Power, Protective Equipment Compatibility, and Packaging, Handling, and Transportation Testing. Conducted prototype refinement based on test data to align with Service requirements in Capabilities Development Document (CDD). SOF CEDS received a FY25 BA5 funding realignment to support testing of additional agents of concern for USSOCOM.

8) Improved Nerve Agent Treatment System Centrally Acting (INATS CA) - Non-Clinical
FY2025 actual$8.1M
FY2026 enacted
FY2027 request

FY2025 accomplishments Completed all non-clinical model studies in support of transition to Rapid Access Product in Development (RAPID).