# Project 3243 — Shipboard Passive Electro-Optical Infrared Development

**Program element:** 0604501N — Advanced Above Water Sensors  
**Project:** 3243  
**Component:** U.S. Navy  
**Appropriation:** 1319 — RDT&E, Navy  
**Budget Activity:** 5 — System Development & Demonstration  
**Vintage:** President's Budget PB2027  
**Canonical URL:** https://hitchintel.com/programs/0604501N/3243  
**Parent:** https://hitchintel.com/programs/0604501N

## Summary

Project 3243 — Shipboard Passive Electro-Optical Infrared Development requests $45.7M in FY2027, 67% of the $67.9M requested for program element 0604501N, down 15% on FY2026. 2 R-2A activities decompose the request. L3Harris is the largest named R-3 performer at $25.7M, 56% of the project's FY2027 R-3 total.

## Funding profile

| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 91.9 |
| FY2026 | Enacted | 54.0 |
| FY2027 | Request | 45.7 |
| FY2028 | Outyear | 11.5 |
| FY2029 | Outyear | 11.0 |
| FY2030 | Outyear | 11.0 |
| FY2031 | Outyear | 11.2 |

> Estimate types are not summed. This project is one leaf of PE 0604501N; the PE total is the sum of its projects, never added to them.

## What project 3243 buys

Shipboard Passive Electro-Optical/ Infrared (SPEIR) Block I provide surface ships a common 360-degree EO/IR Electronic Support (ES) capability that will passively find, fix, track, and target current/emerging threats in support of the following warfare missions: Anti-Ship Cruise Missile (ASCM) Defense, Counter-Unmanned Aircraft Systems (UAS), Counter-Fast Attack Craft / Fast Inshore Attack Craft (FAC/FIAC), and Mobility. SPEIR Block I will consist of a passive Wide Field of View (WFOV) capability with a persistent 360-degree field-of-view optical sensors for autonomous detection and tracking for 24/7 situational awareness. SPEIR Block I will also include an enhanced, high-resolution Narrow-Medium Field of View (NFOV) and laser range-finding capability to provide 3D target tracking, identification, and threat assessment. SPEIR Block II will be a future program that will build on the modular open systems architecture of Block I with an expanded spatial coverage envelope and will add the capability for Periscope Detection and Discrimination (PDD), Mine Like Object (MLO) avoidance, networked operations, and full integration with the Future Integrated Combat System. Status of SPEIR Block I Major Milestones: Milestone B completed 3QFY22, and procurement of Low Rate Initial Production (LRIP) Lot 1 Long Lead Material (LLM) (2QFY25) and LRIP (3QFY26). The FY27 budget request supports software upgrades and the associated integration effort, and program testing. Scope also includes LRIP delivery, training curriculum development, commencement of Land Based Testing and continuing the Engineering & Manufacturing Development phase. Additionally, the completion of Modeling and Simulation (M&S) development and maturation, and completion of SPEIR Test and Certification are also planned in FY27. FY26 to FY27 funding decreases are due to the ramp down of developmental activities. Efforts will also include development of capability to integrate SPEIR with the AEGIS Combat System. RDT&E costs are ramping down in FY27 as a result of completion of Integration & Development Test planning, the majority of core software development, EDM material procurements, and all three (3) EDMs are assembled and integrated to support the execution of developmental test events prior to program transition to the Production phase.

**R-3 lines of work:** Product Development; Support; Test and Evaluation; Management Services.

## Named R-3 performers

| Performer | $M | Share of this project's FY2027 R-3 total |
|---|---|---|
| L3Harris | 25.7 | 56% |
| Lockheed Martin | 7.5 | 16% |
| APL | 2.7 | 5.9% |
| NRL | 2.1 | 4.6% |

> Budget-justification contract funding, not obligations. Shares need not reach 100% — unnamed and government work is in the denominator.

## Activities (R-2A) — 2

| Activity | FY2025 | FY2026 | FY2027 | Move | Page |
|---|---|---|---|---|---|
| SPEIR Block I Development | 61.3 | 36.2 | 33.2 | −8% | [a1](https://hitchintel.com/programs/0604501N/3243/a1) |
| SPEIR Block I Systems Engineering | 30.6 | 17.8 | 12.5 | −30% | [a0](https://hitchintel.com/programs/0604501N/3243/a0) |

> Activities carry the prior, current and budget year only — no five-year plan. In the request year they partition this project exactly; in earlier years they can under-cover it.

### SPEIR Block I Development

- Continue support and oversight of Engineering Development Model (EDM) activities - Continue and complete Hardware & Software Integration - Continue development for Combat System Integration (CSI) - Complete SPEIR Test & Certification events - Deliver LRIP for commencement of installation to the initial Test Ship - Complete…

Full year-by-year narrative: https://hitchintel.com/programs/0604501N/3243/a1

### SPEIR Block I Systems Engineering

- Complete support and oversight of Engineering Development Model (EDM) hardware and software development and integration - Continue review and assessment of contract deliverables - Conduct and execute LRIP delivery and associated acquisition documentation - Provide engineering oversight of development for combat system integration…

Full year-by-year narrative: https://hitchintel.com/programs/0604501N/3243/a0

## What is NOT on this page

Congressional marks, the R-2 mission description and acquisition strategy, the industry vs government split of the whole request, and related program elements are recorded at **program-element** grain — an NDAA mark lands on a PE, never on a project. They are at https://hitchintel.com/programs/0604501N.

## Source & machine access

- **Source:** FY2027 Department of the Navy RDT&E Budget Justification, Exhibits R-2/R-2A/R-3, PE 0604501N project 3243 (PB PB2027).
- **MCP:** `mcp.hitchintel.com` — `budget_get_program_element(pe="0604501N")`.