# Project 1950 — New Design SSN Combat Sys Dev

**Program element:** 0604558N — New Design SSN  
**Project:** 1950  
**Component:** U.S. Navy  
**Appropriation:** 1319 — RDT&E, Navy  
**Budget Activity:** 5 — System Development & Demonstration  
**Vintage:** President's Budget PB2027  
**Canonical URL:** https://hitchintel.com/programs/0604558N/1950  
**Parent:** https://hitchintel.com/programs/0604558N

## Summary

Project 1950 — New Design SSN Combat Sys Dev requests $39.3M in FY2027, 17% of the $237.1M requested for program element 0604558N, up 3.7% on FY2026. 2 R-2A activities decompose the request. Lockheed Martin is the largest named R-3 performer at $12.3M, 31% of the project's FY2027 R-3 total.

## Funding profile

| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 41.6 |
| FY2026 | Enacted | 37.9 |
| FY2027 | Request | 39.3 |
| FY2028 | Outyear | 39.1 |
| FY2029 | Outyear | 38.8 |
| FY2030 | Outyear | 39.4 |
| FY2031 | Outyear | 40.1 |

> Estimate types are not summed. This project is one leaf of PE 0604558N; the PE total is the sum of its projects, never added to them.

## What project 1950 buys

This project provides the engineering development required to outfit each ship of the Virginia Class Submarine with a combat system which satisfies ORD requirements in all 7 mission areas, namely; ASW, STRIKE, ISR, Covert Mine Warfare, Battle Group Support, ASUW, and Special Warfare. The fully integrated combat system, otherwise referred to as the Non-Propulsion Electronics System (NPES), is composed of a collection of functional sub-systems, such as sonar, navigation, exterior communications, weapons launch, Large Vertical Array, Submarine Warfare Federated Tactical System (SWFTS) virtualization, Electronic Warfare Next Generation Architecture, etc., which evolve over the life of the program due to either competitive selection of new suppliers, component obsolescence replacement, increased technical performance, or improvements in reliability. Non-recurring engineering activity is needed to perform platform integration of the components, software modification to accommodate electronic data exchange, unique submarine environment qualification and update of all logistics products.

**R-3 lines of work:** Product Development.

## Named R-3 performers

| Performer | $M | Share of this project's FY2027 R-3 total |
|---|---|---|
| Lockheed Martin | 12.3 | 31% |
| Electric Boat | 1.8 | 4.5% |
| SSC | 1.3 | 3.2% |

> Budget-justification contract funding, not obligations. Shares need not reach 100% — unnamed and government work is in the denominator.

## Activities (R-2A) — 2

| Activity | FY2025 | FY2026 | FY2027 | Move | Page |
|---|---|---|---|---|---|
| Sonar, Combat Control, and Architecture (S/CC/A) Subsystems | 24.3 | 22.7 | 22.4 | −1% | [a0](https://hitchintel.com/programs/0604558N/1950/a0) |
| C3I Systems Engineering | 17.3 | 15.3 | 16.9 | +11% | [a1](https://hitchintel.com/programs/0604558N/1950/a1) |

> Activities carry the prior, current and budget year only — no five-year plan. In the request year they partition this project exactly; in earlier years they can under-cover it.

### Sonar, Combat Control, and Architecture (S/CC/A) Subsystems

-Continue design and component selection for the TI-28 S/CC/A configuration. -Complete land based integration testing at the System of Systems level for the emerging new architecture employing a common computing environment and Platform As A Service (PaaS) architecture. -Continue NPES level test and evaluation of cyber hardening measures…

Full year-by-year narrative: https://hitchintel.com/programs/0604558N/1950/a0

### C3I Systems Engineering

-Continue SSN 812 Subsea Seabed Warfare platform unique NPES integration and test plans. -Continue development of NPES-wide Government Furnished Information (GFI) required by the shipbuilder to make platform compatible changes to the power, cooling, and cabling systems for the TI-28 configuration. -Complete trade studies to evaluate…

Full year-by-year narrative: https://hitchintel.com/programs/0604558N/1950/a1

## What is NOT on this page

Congressional marks, the R-2 mission description and acquisition strategy, the industry vs government split of the whole request, and related program elements are recorded at **program-element** grain — an NDAA mark lands on a PE, never on a project. They are at https://hitchintel.com/programs/0604558N.

## Source & machine access

- **Source:** FY2027 Department of the Navy RDT&E Budget Justification, Exhibits R-2/R-2A/R-3, PE 0604558N project 1950 (PB PB2027).