RDT&E Project · President's Budget PB2027

Encapsulated Effector

Project 2993·PE 0604601N — Mine Development·U.S. Navy·BA5
FY2027 Request
$40.6M
◆ Restart — nothing in FY2026
HitchAI read

Project 2993 — Encapsulated Effector requests $40.6M in FY2027, 26% of the $158.7M requested for program element 0604601N — a restart: funded in FY2025, zeroed in FY2026, funded again now. 4 R-2A activities decompose the request, 4 restarted this cycle. GDMS is the largest named R-3 performer at $15.5M, 38% of the project's FY2027 R-3 total.

Restart

This project was funded in FY2025 ($64.2M), zeroed in FY2026, and requests $40.6M again in FY2027. A restart has an incumbent and a new start does not; with a zero current year there is no percentage to quote, which is why it appears in no growth ranking.

FY2027 Request
$40.6M
No FY2026 funding
FY2026 Enacted
$0.0M
▼ 100% vs FY2025
FY2025 Actual
$64.2M
Prior year
Project detail

What project 2993 buys

The Encapsulated Effector, Hammerhead, program complements existing shallow-water mines by providing maritime mining capability in deeper water depths. Based on the urgency of the requirement, the Hammerhead program utilizes Section 804 authority to streamline acquisition of an initial capability. The system uses existing kinetic payloads to engage enemy targets and provides a wide area of coverage per each weapon. The program uses a self-contained, propelled weapon to engage the target when a target is detected. The system uses modern sensing and processing technology to enable accurate targeting at increased range and maintains minefield resilience even as weapons are expended against targets. The result is expanded operating areas to restrict or deny adversary access to the intended area while using fewer weapons than traditional mines. Additional efforts include; transitioning an encapsulation system with different end effectors under the Compact Encapsulated Effector (C-ENCAP) future naval capability (FNC) that is managed by the Office of Naval Research (ONR).

R-3 lines of work
  • Product Development
  • Support
  • Test and Evaluation
  • Management Services
Funding trajectory

Project 2993 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

2550064.2FY25ACTUAL0.0FY26ENACTED40.6FY27REQUEST42.9FY2843.6FY2943.7FY3044.6FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual64.2
FY2026Enacted0.0
FY2027Request40.6
FY2028Outyear42.9
FY2029Outyear43.6
FY2030Outyear43.7
FY2031Outyear44.6
Inside the project

4 accomplishments / planned programs

The R-2A exhibit — the only level of the budget that describes work that has not happened yet. Activities carry the prior, current and budget year only, no five-year plan. Coverage is partial across the corpus, so count activities, never total them.

Product DevelopmentRESTART
FY2025 actual$54.7M
FY2026 enacted$0.0M
FY2027 request$33.0M

FY2027 planned work -Complete Classified Component (CC) CDR -Complete CC development -Begin Effector upgrades

FY2026 to FY2027 change The FY 2027 increase in funding supports completing the design and development of the classified component sensor upgrades and beginning Effector upgrades

FY2026 plans — current year -Continue Classified Component (CC) Development -Complete Critical Design Review (CDR) 1 -Complete CDR 2

Test and EvaluationRESTART
FY2025 actual$7.2M
FY2026 enacted$0.0M
FY2027 request$5.5M

FY2027 planned work -Complete NSWC PCD Classified Component (CC) Integration Test -Begin CC Environmental Testing -Complete SIT 3.0 -Complete System of System (SoS) Integration

FY2026 to FY2027 change FY 2027 increase in funding supports completion of Mod 1 test events, including SIT 3.0 and SoS Integration

FY2026 plans — current year -Complete System Integration Test (SIT) 1,0 -Complete Keyport Swim Out Test -Complete Vortex Induced Vibration (VIV) test -Complete MK 54 Mod 1 Swim Out 2 -Complete SIT 2.0

SupportRESTART
FY2025 actual$1.7M
FY2026 enacted$0.0M
FY2027 request$1.4M

FY2027 planned work -Continue engineering support of Hammerhead mine design and development

FY2026 to FY2027 change FY 2027 increase in funding is for engineering support of design and development.

FY2026 plans — current year -Continue engineering support of Hammerhead mine design and development

ManagementRESTART
FY2025 actual$0.6M
FY2026 enacted$0.0M
FY2027 request$0.7M

FY2027 planned work -continue to provide programmatic and financial support

FY2026 to FY2027 change FY 2027 increase in funding is for programmatic and financial support.

FY2026 plans — current year -Continue to provide programmatic and financial support.

Who's building it

Named performers on project 2993

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

GDMS
$15.5M · 38%