Project 640011 — Architecture & Integration Core Ops and Gap Assessment requests $57.6M in FY2027, 100% of the $57.6M requested for program element 0604609F, up 483% on FY2026. 2 R-2A activities decompose the request.

FY2027 Request
$57.6M
▲ 483% vs FY2026
FY2026 Enacted
$9.9M
▲ 5.2% vs FY2025
FY2025 Actual
$9.4M
Prior year
Project detail

What project 640011 buys

This Project performs core Planning for Development activities, maturing candidate concepts derived from USAF Force Design and Department of War (DoW) priorities to accelerate acquisition timelines, reduce technology risks, demonstrate integration, and deliver potential solutions to address warfighting needs. Key activities include Capability Based Assessments (CBA), analytic refinement studies similar to Analysis of Alternatives (AoA), and other pre-Milestone A planning to determine operational viability and prepare for transition to a Program of Record (PoR), often before a program office is established. It utilizes modern digital tools and methodologies to create a data-driven decision space for concepts not yet mature enough for formal acquisition decisions. These efforts produce technical descriptions that include open systems architectures, industrial base analysis, and initial product support plans to enable future acquisition, testing, and training. The goal is to deliver high-confidence initial designs, performance estimations, and risk identification in coordination with Department of the Air Force (DAF) priorities within a multi-level security structure. It supports the development of single-domain, multi-domain, and system-of-systems solutions. This may include developing contracting structures to foster a competitive industrial base. This Project includes execution on a broad-scope weaponeering analysis effort, "Ensemble Analysis”, of layered and sequenced weapons effects to inform, shape, and guide counter-HDBT employment and acquisition decisions, as well as any follow-on analysis efforts. Program management support costs including, but not limited to, hardware, software, travel, contractor support services, civilian pay, supplies, facilities, and infrastructure. This program element included all necessary expenses required to manage, execute, and deliver weapon system capability. The use of such program funds would be in addition to the civilian pay expenses budgeted in program elements 0605829F, 0605831F, 0605833F, and 0605898F. This requirement supports performance of a full financial audit as required by title 10 U.S.C. Chapter 9A, Sec 240-D.

R-3 lines of work
  • Support
  • Test and Evaluation
Funding trajectory

Project 640011 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

5010015009.4FY25ACTUAL9.9FY26ENACTED57.6FY27REQUEST68.6FY2892.6FY29132.6FY30173.0FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual9.4
FY2026Enacted9.9
FY2027Request57.6
FY2028Outyear68.6
FY2029Outyear92.6
FY2030Outyear132.6
FY2031Outyear173.0
Inside the project

2 accomplishments / planned programs

The R-2A exhibit — the only level of the budget that describes work that has not happened yet. Activities carry the prior, current and budget year only, no five-year plan. 1 of them describes FY2027 work in enough detail to have its own page; the rest are shown here in full. Coverage is partial across the corpus, so count activities, never total them.

FY2025 actual$9.4M
FY2026 enacted$9.9M
FY2027 request$57.6M

- Continue HVAA-P Planning for Development activities as informed by the endgame demonstration. - Commence additional Planning for Development and conduct further concept refinement activities in response to Force Design and DoW priorities. These efforts will address critical capability areas including, but not limited to, Autonomy…

Read the FY2027 plan →
Capability Development System Attribute Definition and Acquisition Planning
FY2025 actual$0.0M
FY2026 enacted$0.0M
FY2027 request$0.0M