RDT&E Project · President's Budget PB2027

Advanced Anti-Submarine Lightweight Torpedo

FY2027 Request
$78.4M
◆ Restart — nothing in FY2026
HitchAI read

Project 3418 — Advanced Anti-Submarine Lightweight Torpedo requests $78.4M in FY2027, 77% of the $102.2M requested for program element 0604610N — a restart: funded in FY2025, zeroed in FY2026, funded again now. 1 R-2A activity decomposes the request, 1 restarted this cycle. OTA- POM is the largest named R-3 performer at $33.6M, 43% of the project's FY2027 R-3 total.

Restart

This project was funded in FY2025 ($78.9M), zeroed in FY2026, and requests $78.4M again in FY2027. A restart has an incumbent and a new start does not; with a zero current year there is no percentage to quote, which is why it appears in no growth ranking.

MarketShipbuilding & Undersea

Matched on this project's title. A title match, not a curated taxonomy — narrative-only matches are not shown at all rather than shown with a caveat nobody reads. No market size is quoted here: a market spans appropriations far beyond this program element.

FY2027 Request
$78.4M
No FY2026 funding
FY2026 Enacted
$0.0M
▼ 100% vs FY2025
FY2025 Actual
$78.9M
Prior year
Project detail

What project 3418 buys

The MK 54 MOD 2 program is continuing incremental development of lethality required to prosecute challenging adversary submarines. FY 2025 funding will be used to complete the POD designs, and receive delivery of the POD hardware and the Technical Data Package (TDPs), and commence development efforts of an Adapter section that enables the assembly of the MOD 2 Forebody sections with the legacy MK 54 MOD 0/1 OTTO Fuel Afterbody. FY 2026 funding will be used to award a contract to an industry Prime, funding the Rapid Prototyping of the INC 1 All-Up-Round (AUR), which combines the MOD 2 Forebody sections with the legacy OTTO Fuel Afterbody. Funding will also be used to conduct INC 1 AUR integration, which will mate POD sections, the new Adapter section, and the legacy OTTO Fuel Afterbody. The program will also continue operational software development and modeling and simulation verification, and continue de-risking efforts for INC 2, ensuring the Stored Chemical Energy Propulsion System (SCEPS) Afterbody design is mature and ready for Rapid Prototyping at the commencement of the INC 2 phase. FY 2027 funding will be used to continue Rapid Prototyping of the INC 1 AUR contract, AUR and Platform integration, operational software development and modeling and simulation verification and continue engineering in-water testing.

R-3 lines of work
  • Product Development
  • Support
  • Test and Evaluation
  • Management Services
Funding trajectory

Project 3418 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

255075078.9FY25ACTUAL0.0FY26ENACTED78.4FY27REQUEST95.7FY2896.0FY2994.1FY3095.9FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual78.9
FY2026Enacted0.0
FY2027Request78.4
FY2028Outyear95.7
FY2029Outyear96.0
FY2030Outyear94.1
FY2031Outyear95.9
Inside the project

1 accomplishment / planned program

The R-2A exhibit — the only level of the budget that describes work that has not happened yet. Activities carry the prior, current and budget year only, no five-year plan. Each describes FY2027 work in enough detail to have its own page; the rest are shown here in full. Coverage is partial across the corpus, so count activities, never total them.

FY2025 actual$78.9M
FY2026 enacted$0.0M
FY2027 request$78.4M

- Continue MOD 2 POM INC 1 AUR Rapid Prototyping. - Continue MOD 2 APB-6 operational software development. - Continue performance Modeling & Simulation and EC WAF modeling and simulation accreditation efforts. - Continue All Up Round and Platform Integration. - Continue Land Based Testing and begin Engineering and Set-to-Hit (STH)…

Read the FY2027 plan →
Who's building it

Named performers on project 3418

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

OTA- POM
$33.6M · 43%
NAWC
$3.7M · 4.7%
Aerojet Rocketdyne
$3.5M · 4.5%
EWCSS