## Summary

Project 3469 — Scaled Onboard Electronic Attack requests $64.4M in FY2027, 33% of the $196.8M requested for program element 0604757N, up 12% on FY2026. 2 R-2A activities decompose the request. LM is the largest named R-3 performer at $17.9M, 28% of the project's FY2027 R-3 total.

**Markets:** Airborne Electronic Warfare — matched on the project title only, and no market size is quoted.

## Funding profile

| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 21.1 |
| FY2026 | Enacted | 57.7 |
| FY2027 | Request | 64.4 |
| FY2028 | Outyear | 53.9 |
| FY2029 | Outyear | 39.7 |
| FY2030 | Outyear | 16.8 |
| FY2031 | Outyear | 17.1 |

> Estimate types are not summed. This project is one leaf of PE 0604757N; the PE total is the sum of its projects, never added to them.

## What project 3469 buys

Scaled Onboard Electronic Attack (SOEA) is an incremental development program by the USN to provide an advanced Electronic Attack (EA) capability against anti-ship missiles. The program is intended to be scalable for Surface Combatants with size, weight, power, and cooling (SWaP-C) constraints that cannot support AN/SLQ-32(V)7; however, it is not intended to replace AN/SLQ-32(V)7. SOEA development executes under a Middle Tier of Acquisition Rapid Prototyping acquisition strategy pursuant to Section 804 of the FY16 National Defense Authorization Act. The SOEA Middle Tier of Acquisition (MTA) leverages technology developed by the Office of Naval Research (ONR) and Naval Research Laboratory (NRL). SOEA's acquisition strategy consists of two phases: Rapid Prototyping and Rapid Fielding. SOEA Phase 1 includes prototyping of critical technology elements (CTEs) via Defense Microelectronics Agency (DMEA) contract agreements to prove out and validate critical performance capability, system architecture functionality, supportability requirements and improvements that build on the CTEs. SOEA Phase 2 will focus on fielding initial capability through the producibility of the Phase 1 prototype, continuing hardware and software improvements to meet full capability objectives, continuing external interfaces for system and platform integration, continuing training module development via the Surface Electronic Warfare Tactical Trainer (SEWTT) and completing Modeling & Simulation (M&S) to support further testing. SOEA will continue to expand the integrated shipboard combat system by providing new integrated EA capability and will be integrated with AN/SLQ-32(V)6. SOEA also includes a government software development and integration effort for a Soft-Kill Coordinator System (SKCS) to manage EA engagements. The FY27 budget request for SOEA supports the continuation of Phase 1 Rapid Prototyping, including performance testing, SEWTT training module development, Modeling & Simulation (M&S) and SKCS integration. The FY27 budget request also supports the initiation of SOEA Phase 2 Rapid Fielding which supports further land-based and environmental testing, initiates software and hardware baseline upgrades, and supports acquisition of additional prototype units.

**R-3 lines of work:** Product Development; Support; Test and Evaluation; Management Services.

## Named R-3 performers

| Performer | $M | Share of this project's FY2027 R-3 total |
|---|---|---|
| LM | 17.9 | 28% |
| NG | 17.9 | 28% |
| NRL | 10.8 | 17% |
| APL | 4.6 | 7.1% |

> Budget-justification contract funding, not obligations. Shares need not reach 100% — unnamed and government work is in the denominator.

## Activities (R-2A) — 2

| Activity | FY2025 | FY2026 | FY2027 | Move | Page |
|---|---|---|---|---|---|
| Scaled Onboard Electronic Attack (SOEA) Development | 14.4 | 44.2 | 36.1 | −18% | [a1](https://hitchintel.com/programs/0604757N/3469/a1) |
| Scaled Onboard Electronic Attack (SOEA) Government Engineering | 6.6 | 13.5 | 28.3 | +110% | [a0](https://hitchintel.com/programs/0604757N/3469/a0) |

> Activities carry the prior, current and budget year only — no five-year plan. In the request year they partition this project exactly; in earlier years they can under-cover it.

### Scaled Onboard Electronic Attack (SOEA) Development

- Continue SOEA Rapid Prototype Development to prove out and validate critical performance capability, system architecture functionality, and supportability requirements. Support failure mode analyses. - Continue software support for SKCS integration. - Continue developing the SOEA training modules of SEWTT - Commence upgrades of…

Full year-by-year narrative: https://hitchintel.com/programs/0604757N/3469/a1

### Scaled Onboard Electronic Attack (SOEA) Government Engineering

- Continue preliminary prototype builds and accept delivery to prove out and validate critical performance capability, system architecture functionality, and supportability requirements. - Continue testing to collect evidence for verification of SOEA requirements. - Continue platform integration studies. - Continue support of modularity…

Full year-by-year narrative: https://hitchintel.com/programs/0604757N/3469/a0

## What is NOT on this page

Congressional marks, the R-2 mission description and acquisition strategy, the industry vs government split of the whole request, and related program elements are recorded at **program-element** grain — an NDAA mark lands on a PE, never on a project. They are at https://hitchintel.com/programs/0604757N.

## Source & machine access

- **Source:** FY2027 Department of the Navy RDT&E Budget Justification, Exhibits R-2/R-2A/R-3, PE 0604757N project 3469 (PB PB2027).
- **MCP:** `mcp.hitchintel.com` — `budget_get_program_element(pe="0604757N")`.