# Project B1H — AN/TPY-2 Sensor

**Program element:** 0605058A — Terminal High Altitude Area Defense (THAAD) RDTE  
**Project:** B1H  
**Component:** U.S. Army  
**Appropriation:** 2040 — RDT&E, Army  
**Budget Activity:** 5 — System Development & Demonstration  
**Vintage:** President's Budget PB2027  
**Canonical URL:** https://hitchintel.com/programs/0605058A/B1H  
**Parent:** https://hitchintel.com/programs/0605058A

## Summary

Project B1H — AN/TPY-2 Sensor requests $132.1M in FY2027, 13% of the $1.05B requested for program element 0605058A — a new start, with no prior-year and no current-year money. 2 R-2A activities decompose the request, 2 new this cycle. RTX / Raytheon is the largest named R-3 performer at $127.6M, 97% of the project's FY2027 R-3 total.

**Markets:** Air & Missile Defense, Electronics & Precision Equipment Repair — matched on the project title only, and no market size is quoted.

## Funding profile

| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2027 | Request | 132.1 |
| FY2028 | Outyear | 62.2 |
| FY2029 | Outyear | 173.9 |
| FY2030 | Outyear | 81.2 |
| FY2031 | Outyear | 203.8 |

> Estimate types are not summed. This project is one leaf of PE 0605058A; the PE total is the sum of its projects, never added to them.

## What project B1H buys

Army Navy/Transportable Radar Surveillance and Control-2 (AN/TPY-2) radar contributes to regional defense by developing, delivering, and deploying/redeploying AN/TPY-2 radars for operations or tests.

**R-3 lines of work:** Product Development; Support.

## Named R-3 performers

| Performer | $M | Share of this project's FY2027 R-3 total |
|---|---|---|
| RTX / Raytheon | 127.6 | 97% |
| STRATEGIC ALLIANCE SOLUTIONS | 0.9 | 0.7% |

> Budget-justification contract funding, not obligations. Shares need not reach 100% — unnamed and government work is in the denominator.

## Activities (R-2A) — 2

| Activity | FY2025 | FY2026 | FY2027 | Move | Page |
|---|---|---|---|---|---|
| Capability Development/Modernization | — | — | 127.6 | new | [a0](https://hitchintel.com/programs/0605058A/B1H/a0) |
| Program Operations | — | — | 4.6 | new | — |

> Activities carry the prior, current and budget year only — no five-year plan. In the request year they partition this project exactly; in earlier years they can under-cover it.

### Capability Development/Modernization — NEW START

- Continue development and testing of a Test Antenna Equipment Unit (AEU) to support integration of THAAD into the Army's Integrated Battle Command System (IBCS) architecture and support other THAAD testing requirements. - Conduct planning and testing the cybersecurity controls, maintains RMF authorizations for managed information…

Full year-by-year narrative: https://hitchintel.com/programs/0605058A/B1H/a0

### Program Operations — NEW START

**FY2027 planned work.** - Provide technical and business management support activities to provide critical program status and decision quality data. - Ensure compliance with internal and external direction, policies, and regulations to deliver critical capability within a consistent and disciplined process. - Conduct internal program reviews to measure program progress. - Continue a Mission Assurance and Manufacturing Engineering Program to include Quality, Configuration Management, Manufacturing, Engineering, and Safety in all phases of the system life cycle, throughout the supply chain, and at all levels of assembly emphasizing high yield rates which minimize test and rework costs. - Provide Quality Safety and Mission Assurance operations to ensure compliance with requirements for design, test, manufacturing, quality, safety and reliability to ensure high quality products are delivered to the Warfighter.

**FY2026 to FY2027 change.** The increase from FY 2026 to FY 2027 is the result of the transfer of efforts from the Missile Defense Agency to the Army.

## What is NOT on this page

Congressional marks, the R-2 mission description and acquisition strategy, the industry vs government split of the whole request, and related program elements are recorded at **program-element** grain — an NDAA mark lands on a PE, never on a project. They are at https://hitchintel.com/programs/0605058A.

## Source & machine access

- **Source:** FY2027 Department of the Army RDT&E Budget Justification, Exhibits R-2/R-2A/R-3, PE 0605058A project B1H (PB PB2027).
- **MCP:** `mcp.hitchintel.com` — `budget_get_program_element(pe="0605058A")`.

*HitchAI is an independent intelligence service, not affiliated with the U.S. Department of Defense. Budget figures are requests/estimates, not obligations.*