What the FY2027 request buys
Verbatim from the R-2A exhibit for project HX2 of PE 0605232A. This is the budget justification's own description of work that has not happened yet — the one thing no other level of the budget carries.
FY 2027 funds continue the development of the LRHW CHGB. Supports further development and demonstration of LRHW system components; prime contractor support of JFC testing and overall system integration of Technology Insertions (TIs). Incrementally funds CHGBs for tactical and test/training/certification AUR+Cs. Provides for development and implementation of improved capabilities into the AUR+C to include M-Code and improved navigation for greater survivability.
In FY 2027, the incremental funding requirement for the CHGB contract decreased due to reduced CHGB quantities in flow.
FY2025–FY2026: what came before
Prior-year accomplishments and current-year plans from the same exhibit. Context for the FY2027 plan, not a series — an activity partitions its project exactly in the request year, but can under-cover it in earlier years.
FY 2026 funds continue the development of the LRHW CHGB. Supports further development and demonstration of LRHW system components and training; prime contractor support of JFC testing and overall system integration of Technology Insertions (TIs). Incrementally funds CHGBs for basic load and reload AUR+Cs and test/training/certification AUR+Cs. Enhances training in accordance with system training plan. An additional $19.401 million Reconciliation funding procures an additional TI-22M CHGB for testing.
FY 2025 Base funds continue the development of the LRHW CHGB. Begins deliveries of CHGB to complete AUR+C assembly and integration of basic load tactical and reload rounds. Supports further development and demonstration of LRHW system components and training; prime contractor support of JFC testing and overall system integration and deployment of fully capable TIs in operational scenarios. Incrementally funds CHGBs for basic load and reload AUR+C and test/training/certification AUR+Cs. Enhances training in accordance with system training plan
Three years, and no five-year plan
An R-2A activity publishes the prior year, the current year and the budget year. The FYDP outyears exist at project and program-element level and are deliberately absent here rather than inferred. Estimate types are colored and never summed into one figure.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 58.5 |
| FY2026 | Enacted | 58.2 |
| FY2027 | Request | 49.1 |
This activity is 11% of project HX2's FY2027 request and 11% of PE 0605232A's. In the request year the activities under a project sum to it exactly; in the current year they under-cover it in about 9% of cases, so an activity's delta can legitimately exceed its parent's and the two must not be compared row to row.
5 activities in project HX2
Every R-2A line of this project, largest FY2027 request first. Linked where the activity has enough of its own narrative to carry a page; the rest are shown in full on the program-element page.