# Platform Fielding

**R-2A activity** of project 3334 — Conventional Prompt Strike (CPS)  
**Program element:** 0605518N — Conventional Prompt Strike (CPS)  
**Component:** U.S. Navy · **Budget Activity:** 4  
**Vintage:** President's Budget PB2027  
**Canonical URL:** https://hitchintel.com/programs/0605518N/3334/a1  
**Parent:** https://hitchintel.com/programs/0605518N

## Summary

This activity requests $80.8M in FY2027, 6.0% of project 3334, up 31% on FY2026. The R-2A exhibit describes it across FY2026–FY2027, including what the FY2027 money is planned to buy.

## What the FY2027 request buys

**FY2027 planned work.** - Continue development of CPS WCS and Mission Planning capability to support ZUMWALT and VIRGINIA deployment. - Complete efforts working towards CPS WS certification in support of ZUMWALT fielding, inclusive of ensuring the authorizations are in place to execute the installation and check out on ZUMWALT. Collect necessary data from testing to contribute to overall assessments of readiness for CPS WS certification on ZUMWALT. - Continue NRE efforts required to modify the Block V VIRGINIA Class design to support the integration of CPS. - Continue design and commence development of the Power Conversion Kit (PCK) for SSN. - Continue efforts to support outfitting during new construction shipyard period for payload control cables and launcher-specific support equipment for CPS integration on VIRGINIA Class hulls. - Continue development of the MK113 simulator for SSN integration design development and testing. - Continue development of AUR+C Simulator (AURCS) Canister for SSN. - Continue development of algorithms for trajectory generation and the Mission Data Load generator for use in CPS Mission Planning, both at geographic combatant commanders through integration into the Theater Mission Planning Center, and onboard platforms as part of the WCS. Perform requirements refinement, CPS Mission Planning System Requirements Review, and software design, development, and integration. - Continue development of the Weapon Safe Arm Free Eject (WSAFE) Eject Valve Module (EVM) simulator. - Continue development of the SSN Specific Canister Closure Assembly (CCA). - Deliver WCS software and hardware in support of JFC-6 flight test and ZUMWALT fielding. -Continue modification of the Virginia Payload Tube Facility (VPTF) for CPS integration and testing. -Commence design, development and prototype of a maritime variant of the Box Erector Launcher System (BELS).

**FY2026 to FY2027 change.** The FY 2026 to FY 2027 increase of $19.329 million supports efforts to complete design work and analysis needed to accelerate the NRE required to modify the Block V VIRGINIA Class design to support the integration of CPS.

## Before the request year

**FY2026 plans — current year.** - Delivered WCS software and hardware in support of JFC-5 flight test. - Continued development of CPS WCS and Mission Planning capability to support ZUMWALT and VIRGINIA deployment. - Continued efforts working towards CPS WS certification in support of ZUMWALT fielding, inclusive of ensuring the authorizations are in place to execute the installation and check out on ZUMWALT. Collected necessary data from testing to contribute to overall assessments of readiness for CPS WS certification on ZUMWALT. - Continued NRE efforts required to modify the Block V VIRGINIA Class design to support the integration of CPS. - Continued design and commence development of the Power Conversion Kit (PCK) for SSN. - Continued efforts to support outfitting during new construction shipyard period for payload control cables and launcher-specific support equipment for CPS integration on VIRGINIA Class hulls. - Continued development of the MK113 simulator for SSN integration design development and testing. - Continued development of AUR+C Simulator (AURCS) Canister for SSN. - Continued development of algorithms for trajectory generation and the Mission Data Load generator for use in CPS Mission Planning, both at geographic combatant commanders through integration into the Theater Mission Planning Center, and onboard platforms as part of the WCS. Performed requirement refinement, CPS Mission Planning System Requirements Review, and software design, development, and integration. - Commenced development of the Weapon Safe Arm Free Eject (WSAFE) Eject Valve Module (EVM) simulator. - Commenced development of the SSN Specific Canister Closure Assembly (CCA). -Commenced modification of the Virginia Payload Tube Facility (VPTF) for CPS integration and testing.

## Funding

| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 64.3 |
| FY2026 | Enacted | 61.5 |
| FY2027 | Request | 80.8 |

> Prior, current and budget year only — an R-2A activity carries no five-year plan. It sums exactly into its project in the request year and not necessarily in any other.

## Other activities in project 3334

- [AUR/APM Development](https://hitchintel.com/programs/0605518N/3334/a0) — FY2027 866.2
- [Test & Evaluation](https://hitchintel.com/programs/0605518N/3334/a3) — FY2027 229.6
- [Science and Technology / Advanced Capabilities (STAC)](https://hitchintel.com/programs/0605518N/3334/a4) — FY2027 120.4
- [Product Support](https://hitchintel.com/programs/0605518N/3334/a2) — FY2027 25.3
- [Program Office Support](https://hitchintel.com/programs/0605518N/3334/a5) — FY2027 19.0

## Source & machine access

- **Source:** FY2027 Department of the Navy RDT&E Budget Justification, Exhibit R-2A, PE 0605518N project 3334 (PB PB2027). Narrative is the government's own text.
- **No marks, no contractors at this grain** — congressional marks land on the program element and R-3 performers on the project.