RDT&E Project · President's Budget PB2027

GBAD: Medium Range Intercept Capability (MRIC)

FY2027 Request
$21.8M
▼ 35% vs FY2026
HitchAI read

Project 2578 — GBAD: Medium Range Intercept Capability (MRIC) requests $21.8M in FY2027, 16% of the $133.0M requested for program element 0605520M, down 35% on FY2026. 3 R-2A activities decompose the request. MCSC is the largest named R-3 performer at $11.5M, 53% of the project's FY2027 R-3 total.

FY2027 Request
$21.8M
▼ 35% vs FY2026
FY2026 Enacted
$33.5M
▲ 786% vs FY2025
FY2025 Actual
$3.8M
Prior year
Project detail

What project 2578 buys

The Medium Range Intercept Capability (MRIC) is a CMC Force Design program providing the Marine Corps Expeditionary Force Commander a capability to defend forward deployed forces primarily against threat cruise missiles; secondarily against UAS and other aerial threats that enter the MRIC's Weapons Engagement Zone (WEZ). MRIC is designed as a system-of-systems and will be integrated with Marine Corps organic Command and Control (C2) and Joint Integrated Air and Missile Defense (IAMD) architecture. The program will enhance the expeditionary force ground-based air defense (GBAD) capability to rapidly prosecute aerial threats and expand layered defense of the Expeditionary and Naval Forces. The MRIC prototype firing exercises were completed 4Q FY 2022 and informed the decision point in 1Q FY2023 to certify for deployment. The certification efforts occurred FY 2023 through FY 2024 and led to a successful decision for prototype deployment 3Q FY 2025. This effort informs the investment to meet the Force Design requirements to field an MRIC Battery to each of the three LAAD Battalions.

R-3 lines of work
  • Product Development
  • Support
  • Test and Evaluation
Funding trajectory

Project 2578 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

2503.8FY25ACTUAL33.5FY26ENACTED21.8FY27REQUEST11.2FY283.9FY291.4FY301.4FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual3.8
FY2026Enacted33.5
FY2027Request21.8
FY2028Outyear11.2
FY2029Outyear3.9
FY2030Outyear1.4
FY2031Outyear1.4
Inside the project

3 accomplishments / planned programs

The R-2A exhibit — the only level of the budget that describes work that has not happened yet. Activities carry the prior, current and budget year only, no five-year plan. 1 of them describes FY2027 work in enough detail to have its own page; the rest are shown here in full. Coverage is partial across the corpus, so count activities, never total them.

FY2025 actual$2.3M
FY2026 enacted$5.5M
FY2027 request$12.4M

-Initiates digital integration and live fire events to confirm MRIC system performance post baseline merge for Ground/Air Task Oriented Radar (G/ATOR) and Common Aviation Command and Control System (CAC2S). -Initiates the purchase of test assets, test planning, and testing such as basic safety series, Hazards of Electromagnetic Radiation…

Read the FY2027 plan →
Medium Range Intercept Capability (MRIC) Product Development▼ 79%
FY2025 actual$0.0M
FY2026 enacted$25.2M
FY2027 request$5.3M

FY2027 planned work -Completes software integration efforts to enable full interoperability between the MRIC system and the associated G/ATOR system and Common Aviation Command and Control System (CAC2S). -Initiates design verification for United States compliant components for production missiles.

FY2026 to FY2027 change Decrease due to completion of prototype improvements and shift into procurement as well as completion of the efforts into integrate MRIC into the CAC2S and G/ATOR baselines.

FY2026 plans — current year -Initiated software integration efforts to enable full interoperability between the MRIC system and the associated G/ATOR system and Common Aviation Command and Control System (CAC2S). -Initiated and completed prototype improvements such launcher mobility/transportability hardening and improvement, missile magazine loader/reloader development and materiel solutions for proper ammunition handling at the tactical unit, and power generation and distribution improvements. -Initiated the design for United States compliant components for production missiles.

Medium Range Intercept Capability (MRIC) Support▲ 48%
FY2025 actual$1.5M
FY2026 enacted$2.8M
FY2027 request$4.1M

FY2027 planned work -Continues the engineering and logistics support required for integration of engineering change proposals resulting from technology advances and deployment of the prototype -Initiates efforts by the Israeli Missile Defense Organization (IMDO) to conduct cyber security updates as well as software support activities as MRIC continues to move towards inclusion in the G/ATOR and CAC2S baseline.

FY2026 to FY2027 change The increase is due to the initiation of efforts by the Israeli Missile Defense Organization (IMDO) to conduct cyber security updates as well as software support activities as MRIC continues to integrate improved hardware.

FY2026 plans — current year -Continued the engineering and logistics support required for integration of engineering change proposals resulting from technology advances and deployment of the prototype. -Initiated the training requirements analysis to ensure Marines within MRIC units receive appropriate training at the schoolhouse.

Who's building it

Named performers on project 2578

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

MCSC
$11.5M · 53%
WSMR
$8.3M · 38%