R-2A Activity · President's Budget PB2027

Survivability, Lethality, Vulnerability (SLV) Analyses for Ground, Aviation, Munitions, and Soldier Systems

Activity a0·Project 675 — Army Survivability Analysis & Evaluation Supp·PE 0605604A·U.S. Army
FY2027 Request
$13.5M
▲ 1.9% vs FY2026
HitchAI read

This activity requests $13.5M in FY2027, 43% of project 675, up 1.9% on FY2026. The R-2A exhibit describes it across FY2025–FY2027, including what the FY2027 money is planned to buy.

FY2027 Request
$13.5M
▲ 1.9% vs FY2026
FY2026 Enacted
$13.3M
▼ 18% vs FY2025
FY2025 Actual
$16.2M
Prior year
Planned work

What the FY2027 request buys

Verbatim from the R-2A exhibit for project 675 of PE 0605604A. This is the budget justification's own description of work that has not happened yet — the one thing no other level of the budget carries.

FY2027 planned work

Will maintain and advance M&S threat representation, analytical methodologies and performance analysis tools to conduct SLV analyses of Army ground, aviation and Soldier systems, component technologies and munitions. Planned activities will include analysis of weapons effectiveness and lethality against near peer threat targets and SLV analyses of components and technologies supporting expanded ground and aviation maneuvers and ammunition. For T2COM, will continue to maintain and generate kinetic/non-kinetic models and threat emulations to support future concepts development. Will provide component and systems-level performance analyses to inform technology maturation, trade-off decisions, and risk reduction.

FY2026 to FY2027 change

Funding increase reflects economic adjustment

Before the request year

FY2025–FY2026: what came before

Prior-year accomplishments and current-year plans from the same exhibit. Context for the FY2027 plan, not a series — an activity partitions its project exactly in the request year, but can under-cover it in earlier years.

FY2026 plans — current year

Will develop and advance Modeling and Simulation (M&S) threat representation and performance analysis tools and methodologies to provide SLV and Human-Machine Integration (HMI) assessments of Army ground, aviation, munitions, and Soldier priority systems and technologies for FCC and Portfolio Acquisition Executives (PAEs). For DEVCOM Centers/ARL, will continue to provide kinetic and non-kinetic analyses. Will also provide cyber and electromagnetic warfare threat emulation and integrated system-level vulnerability and survivability assessments to enable technology development, inform prototype and system design decisions and reduce technology risks through experimentation and Testing and Evaluation (T&E) of ground, aviation, munitions and Soldier technologies.

FY2025 accomplishments

Developed and advanced foundational SLV analytical capabilities to conduct analyses and assessments of ground, aviation, munitions, and Soldier technology survivability/lethality as specified by AFC/DEVCOM and AEC highest priority systems including vulnerabilities related to Artificial Intelligence (AI), autonomy, human-agent teaming, and Cyber and Electromagnetic Activities (CEMA). Provided data and analysis support throughout AFC experimentation and the Future Study Program. For DEVCOM Centers/Army Research Laboratory (ARL), provided cyber and electronic warfare threat representation, lethality estimates, and performance analyses to inform prototype technology developers, influence design, and mature ground, aviation, munitions, and Soldier technologies and reduce risk.

Money

Three years, and no five-year plan

An R-2A activity publishes the prior year, the current year and the budget year. The FYDP outyears exist at project and program-element level and are deliberately absent here rather than inferred. Estimate types are colored and never summed into one figure.

016.2FY25ACTUAL13.3FY26ENACTED13.5FY27REQUEST
Actual Enacted Request
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual16.2
FY2026Enacted13.3
FY2027Request13.5

This activity is 43% of project 675's FY2027 request and 43% of PE 0605604A's. In the request year the activities under a project sum to it exactly; in the current year they under-cover it in about 9% of cases, so an activity's delta can legitimately exceed its parent's and the two must not be compared row to row.

Where this sits

3 activities in project 675

Every R-2A line of this project, largest FY2027 request first. Linked where the activity has enough of its own narrative to carry a page; the rest are shown in full on the program-element page.

Command, Control, Communications, Computers, Intelligence, Surveillance and Reconnaissance (C4ISR) System Survivability Assessments$15.4M ▼ 2%
Survivability, Lethality, Vulnerability (SLV) Analyses for Ground, Aviation, Munitions, and Soldier Systems — this activity$13.5M ▲ 2%
Survivability, Lethality, Vulnerability (SLV) Analyses for Developmental Air and Missile Defense Systems$2.4M ▲ 2%
Source
FY2027 Department of the Army RDT&E Budget Justification · Exhibit R-2A · PE 0605604A, project 675 (President's Budget PB2027). Congressional marks are recorded on the program element, never on an activity.
Machine access
Markdown twin /programs/0605604A/675/a0.md · MCP mcp.hitchintel.combudget_get_activity