R-2A Activity · President's Budget PB2027

System Test & Evaluation

Activity a6·Project CF6 — Optionally Manned Fighting Vehicle (OMFV)·PE 0605625A·U.S. Army
FY2027 Request
$56.4M
▲ 144% vs FY2026
HitchAI read

This activity requests $56.4M in FY2027, 19% of project CF6, up 144% on FY2026. The R-2A exhibit describes it across FY2025–FY2027, including what the FY2027 money is planned to buy.

FY2027 Request
$56.4M
▲ 144% vs FY2026
FY2026 Enacted
$23.1M
▼ 39% vs FY2025
FY2025 Actual
$37.9M
Prior year
Planned work

What the FY2027 request buys

Verbatim from the R-2A exhibit for project CF6 of PE 0605625A. This is the budget justification's own description of work that has not happened yet — the one thing no other level of the budget carries.

FY2027 planned work

This effort funds activities associated with the XM30 Government Pre-Production Prove-Out Testing (PPT), including operational test events in support of Transformation in Contact (TiC) and other test and evaluation events aligned with program milestones and decision points. Specific costs survivability testing for two vendors, encompassing the use of armor coupons and ballistic hull and turret assessments. Additionally, this funding covers initial inspections of remaining prototype deliveries, TiC and NTC evaluations in accordance with the PPT and TiC schedule. This effort also includes any testing requirements and associated costs related to the delivery of Software Pathway Minimum Viable Capability Release(s) (SWP MVCR).

FY2026 to FY2027 change

The increase from FY 2026 to FY 2027 is the transition from prototype build to PPT vehicle test to support Transformation in Contact (TiC).

Before the request year

FY2025–FY2026: what came before

Prior-year accomplishments and current-year plans from the same exhibit. Context for the FY2027 plan, not a series — an activity partitions its project exactly in the request year, but can under-cover it in earlier years.

FY2026 plans — current year

This funds efforts associated with the XM30 Government Pre-production Prove-out testing (PPT), including operational test events in support of Transformation in Contact (TiC) and other test and evaluation events in support of program milestones and decision points. These costs include survivability testing for two vendors with armor coupons and ballistic hull and turrets. These costs include instrumentation, test planning and execution for safety testing and Development Testing (DT), Initial Familiarization Training (IFT) and Experimental Equipment Training (EET) for prototypes delivered from two vendors per the PPT/TiC Schedule. Also included are any testing requirements costs associated with the delivery of SWP MVCR(s).

FY2025 accomplishments

This cost continues to fund the efforts for the XM30 Government Production Prove-out testing (PPT) of XM30 designs for two vendors. Each vendor will build 8 prototypes for USG test purposes along with 2 Ballistic Hull and Turrets (BH&T). Includes a cost to add 2 battery sets for each of the Ballistic Hull &Turrets (BH&Ts) to support Live fire testing. Due to a schedule change for the Live Fire BH&T delivery, there is an added cost shipping to test sites due to moving around subtests and locations. This cost funds long lead material items including armor coupons, Government Furnished Material (GFM) integration and test spares, lethality ammunition and threat ammunition for the testing of prototypes for two vendors. Also, adds a Gross Vehicle Weight Rating (GVWR) ballast kit to vehicle G4 during the automotive test block to test and verify the GVWR P-SPECs. This line funds the procurement of the Multiple Integrated Laser Engagement (MILES) gear for the soldier assessments and unanticipated additional development and prove out of the XM913 due to ammo and weapon failures.

Money

Three years, and no five-year plan

An R-2A activity publishes the prior year, the current year and the budget year. The FYDP outyears exist at project and program-element level and are deliberately absent here rather than inferred. Estimate types are colored and never summed into one figure.

2550037.9FY25ACTUAL23.1FY26ENACTED56.4FY27REQUEST
Actual Enacted Request
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual37.9
FY2026Enacted23.1
FY2027Request56.4

This activity is 19% of project CF6's FY2027 request and 19% of PE 0605625A's. In the request year the activities under a project sum to it exactly; in the current year they under-cover it in about 9% of cases, so an activity's delta can legitimately exceed its parent's and the two must not be compared row to row.

Where this sits

10 activities in project CF6

Every R-2A line of this project, largest FY2027 request first. Linked where the activity has enough of its own narrative to carry a page; the rest are shown in full on the program-element page.

Product Development$179.5M ▼ 33%
System Test & Evaluation — this activity$56.4M ▲ 144%
Government Engineering & Program Management$23.2M ▼ 15%Digital Engineering$21.7M ▼ 35%
Software Pathway$4.0M ▼ 19%
Modeling Simulation & Analysis$2.6M ▼ 43%
XM913 Maturation$2.4M ▼ 50%
Training Aids, Devices, Simulators & Simulation (TADSS)$0.2M ▼ 89%
Government Architecture▼ 100%
Technology Maturation & Analysis
Source
FY2027 Department of the Army RDT&E Budget Justification · Exhibit R-2A · PE 0605625A, project CF6 (President's Budget PB2027). Congressional marks are recorded on the program element, never on an activity.