RDT&E Project · President's Budget PB2027

US Army Corps of Engineers Base Operations

Project M23·PE 0605801A — Programwide Activities·U.S. Army·BA6
FY2027 Request
$21.0M
▼ 1.0% vs FY2026
HitchAI read

Project M23 — US Army Corps of Engineers Base Operations requests $21.0M in FY2027, 40% of the $53.0M requested for program element 0605801A, down 1.0% on FY2026. 1 R-2A activity decomposes the request.

FY2027 Request
$21.0M
▼ 1.0% vs FY2026
FY2026 Enacted
$21.2M
▼ 39% vs FY2025
FY2025 Actual
$34.6M
Prior year
Project detail

What project M23 buys

This Project provides funding for authorized civilian workforce performing engineer research, development, management and oversight that support the engineer Research, Development, Test, and Evaluation (RDTE) programs at the United States (U.S.) Engineer Research and Development Center (ERDC). This Project supports the non-Army Management Headquarters Activity (non-AMHA) management and administrative functions to enable ERDC to accomplish its research mission and includes activities such as procurement oversight, RDTE programming and budget execution, management control and oversight, safety, information management and technology, personnel/manpower execution and oversight, research laboratory/facility management and maintenance, and High Performance Computing Modernization Program (HPCMP) facility operations and management ERDC research in civil and military engineering, blast and weapons effects, battlespace terrain mapping and characterization, computational prototyping of military platforms, and cold regions science and engineering provides effective non-materiel and materiel solutions to enable the Army to achieve its modernization priorities of Air and Missile Defense, Next Generation Combat Vehicle, Future Vertical Lift, Network, Long Range Precision Fires, and Soldier Lethality.

Funding trajectory

Project M23 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

25034.6FY25ACTUAL21.2FY26ENACTED21.0FY27REQUEST20.6FY2820.0FY2919.5FY3019.9FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual34.6
FY2026Enacted21.2
FY2027Request21.0
FY2028Outyear20.6
FY2029Outyear20.0
FY2030Outyear19.5
FY2031Outyear19.9
Inside the project

1 accomplishment / planned program

The R-2A exhibit — the only level of the budget that describes work that has not happened yet. Activities carry the prior, current and budget year only, no five-year plan. Each describes FY2027 work in enough detail to have its own page; the rest are shown here in full. Coverage is partial across the corpus, so count activities, never total them.

FY2025 actual$34.6M
FY2026 enacted$21.2M
FY2027 request$21.0M

Will provide operation of management, administrative, personnel, budget, logistics and support functions at a level consistent with Army and mission requirements to meet the needs of ERDC conducting the Army's engineer R&D program supporting all six of the Army's Modernization Priorities.

Read the FY2027 plan →