RDT&E Project · President's Budget PB2027

INTEGRATED SIMULATION AND ANALYSIS

Project 666158·PE 0606017F — Requirements Analysis and Maturation·U.S. Air Force·BA6
FY2027 Request
$10.9M
▼ 35% vs FY2026
HitchAI read

Project 666158 — INTEGRATED SIMULATION AND ANALYSIS requests $10.9M in FY2027, 50% of the $21.7M requested for program element 0606017F, down 35% on FY2026. 1 R-2A activity decomposes the request.

FY2027 Request
$10.9M
▼ 35% vs FY2026
FY2026 Enacted
$16.8M
▼ 1.1% vs FY2025
FY2025 Actual
$17.0M
Prior year
Project detail

What project 666158 buys

The Integrated Simulation and Analysis project funds activities that develop and support integrated analysis and digital engineering tools for the Capability Development Enterprise. In addition, the project develops tools and methodologies to support required analysis and studies; this produces system performance representations/models, environments, architectures, digital artifacts, data, and tools that underpin variable fidelity, stand-alone, interactive, and distributed simulations. The project incorporates Mission Engineering and Digital Engineering enterprise tools and methods (i.e. Model-Based Systems Engineering [MBSE], Modeling Simulation and Analysis [MS&A] ecosystem) as the technical and digital underpinning for the simulation models/ behaviors; it develops and maintains digital records for future analytical needs and serves as a template to identify, road map, and enable the Modeling and Simulation- centric portions of the acquisition life cycle and of operational missions. The project may fund IT and licenses to execute modern Mission Engineering and Digital Engineering. The project initiates and leverages studies performed by industry, academia, FFRDCs and UARCs that may be required to develop and create technology representative models and data. Program management support costs including, but not limited to, hardware, software, travel, contractor support services, civilian pay, supplies, facilities, and infrastructure. This program may include necessary civilian pay expenses required to manage, execute, and deliver Requirements Analysis and Maturation capability. The use of such program funds would be in addition to the civilian pay expenses budgeted in program element 0605829F, 0605831F, 0605833F, and 0605898F.

Funding trajectory

Project 666158 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

017.0FY25ACTUAL16.8FY26ENACTED10.9FY27REQUEST21.3FY2821.6FY2921.9FY3022.4FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual17.0
FY2026Enacted16.8
FY2027Request10.9
FY2028Outyear21.3
FY2029Outyear21.6
FY2030Outyear21.9
FY2031Outyear22.4
Inside the project

1 accomplishment / planned program

The R-2A exhibit — the only level of the budget that describes work that has not happened yet. Activities carry the prior, current and budget year only, no five-year plan. Each describes FY2027 work in enough detail to have its own page; the rest are shown here in full. Coverage is partial across the corpus, so count activities, never total them.

FY2025 actual$17.0M
FY2026 enacted$16.8M
FY2027 request$10.9M

-Continue to develop, enhance, and proliferate enterprise MS&A capabilities on behalf of the USAF and DAF (and Joint MS&A community through tool interoperability and reusability). - Continue to implement USAF Acquisition network for classified analysis while providing a production development environment with stable RDT&E investment to…

Read the FY2027 plan →